CHAPTER 2 HIGHWAY GEOMETRIC DESIGN
Importance of Geometric Design
factors affecting highway geometric design
Design controls and Criteria-
Highway Cross Section Elements-
Sight Distance Elements-
Stopping sight Distance,
Overtaking Sight Distance
Intermediate Sight Distance
Design of Horizontal Alignment
Design of Super elevation
Extra widening
Design of Transition Curves
Design of Vertical alignment
Gradients-
Vertical curves
CHAPTER 3 TRAFFIC ENGINEERING AND REGULATION
Basic Parameters of Traffic
Volume, Speed and density
Traffic volume studies-Data collection and presentation
Speed studies –Data collection and presentation-
Origin and Destinations studies,
Parking Studies
Onstreet and offstreet parking
Road Accidents –
Causes and Preventive measures
Accident Data Recording
Condition Diagram and Collision Diagrams
Traffic Signs – Types and Specifications
Road markings-Need for Road Markings
Types of Road Markings-
Design of Traffic Signals- Webster method.
II
CHAPTER 4 INTERSECTION DESIGN
Types of Intersections
Conflicts at Intersections
Requirements of At –Grade intersection-
Types of at-Grade Intersections-
Chanalization -Traffic Islands
Types of Grade Separated Intersections
Rotary Intersection –concept of Rotary
Design factors of rotary
Advantages and limitations of rotary intersections.
CHAPTER 5 HIGHWAY MATERIAL, CONSTRUCTION ANDMAINTENANCE: Highway material characterization
Subgrade soil
Stone aggregate
Bitumen materials
Construction of gravel road
Construction of water bound macadam road
Construction of bituminous pavements
Surface dressing
Bitumen bound macadam
Bituminous concrete
Construction of cement concrete pavements
Construction of joints in cement concrete pavements
Joint filter and seal
Pavement failures
Maintenance of highways
Highway Drainage.
4
CHAPTER 1
HIGHWAY DEVELOPMENT AND PLANNING
Overview
Road transport is one of the most common mode of transport. Roads in the form of trackways, human pathways etc. were used even from the pre-historic times. Since then many experiments were going on to make the riding safe and comfort. Thus road construction became an inseparable part of many civilizations and empires. In this chapter we will see the di erent generations of road and their characteristic features. Also we will discuss about the highway planning in India.
History of highway engineering
The history of highway enginnering gives us an idea about the roads of ancient times. Roads in Rome were constructed in a large scale and it radiated in many directions helping them in military operations. Thus they are considered to be pioneers in road construction. In this section we will see in detail about Ancient roads, Roman roads, British roads, French roads etc.
Ancient Roads
The rst mode of transport was by foot. These human pathways would have been developed for speci c purposes leading to camp sites, food, streams for drinking water etc. The next major mode of transport was the use of animals for transporting both men and materials. Since these loaded animals required more horizontal and vertical clearances than the walking man, track ways emerged. The invention of wheel in Mesopotamian civilization led to the development of animal drawn vehicles. Then it became necessary that the road surface should be capable of carrying greater loads. Thus roads with harder surfaces emerged. To provide adequate strength to carry the wheels, the new ways tended to follow the sunny drier side of a path. These have led to the development of foot-paths. After the invention of wheel, animal drawn vehicles were developed and the need for hard surface road emerged. Traces of such hard roads were obtained from various ancient civilization dated as old as 3500 BC. The earliest authentic record of road was found from Assyrian empire constructed about 1900 BC.
Roman roads
The earliest large scale road construction is attributed to Romans who constructed an extensive system of roads radiating in many directions from Rome. They were a remarkable achievement and provided travel times across
2.7 m
Sloping Wearing Surface 5cm thick
Shoulder Slope 1:20
______________
_
______________
______________
_______
_
Side drain
_
_
__
____________________________________
5
Broken stones 8cm thick
Large foundation stones on edge17cm thick
Figure 2:2: French roads
Europe, Asia minor, and north Africa. Romans recognized that the fundamentals of good road construction were to provide good drainage, good material and good workmanship. Their roads were very durable, and some are still existing. Roman roads were always constructed on a rm - formed subgrade strengthened where necessary with wooden piles. The roads were bordered on both sides by longitudinal drains. The next step was the construction of the agger. This was a raised formation up to a 1 meter high and 15 m wide and was constructed with materials excavated during the side drain construction. This was then topped with a sand leveling course. The agger contributed greatly to moisture control in the pavement. The pavement structure on the top of the agger varied greatly. In the case of heavy tra c, a surface course of large 250 mm thick hexagonal ag stones were provided. A typical cross section of roman road is given in Figure 2:1 The main features of the Roman roads are that they were built straight regardless of gradient and used heavy foundation stones at the bottom. They mixed lime and volcanic puzzolana to make mortar and they added gravel to this mortar to make concrete. Thus concrete was a major Roman road making innovation.
2.2.3 French roads
The next major development in the road construction occurred during the regime of Napoleon. The signi cant contributions were given by Tresaguet in 1764 and a typical cross section of this road is given in Figure 2:2. He developed a cheaper method of construction than the lavish and locally unsuccessful revival of Roman practice. The pavement used 200 mm pieces of quarried stone of a more compact form and shaped such that they had at least one at side which was placed on a compact formation. Smaller pieces of broken stones were then compacted into the spaces between larger stones to provide a level surface. Finally the running layer was made with a layer of 25 mm sized broken stone. All this structure was placed in a trench in order to keep the running surface level with the surrounding country side. This created major drainage problems which were counteracted by making the surface as impervious as possible, cambering the surface and providing deep side ditches. He gave
4.5 m
Cross slope
___________
_____________
_________________
_____________
__ _
_________________
___________
__ _
_
_________________
__
_
_________________
_
_________
_________________
_
Side drain
_________________
_________________
_________________
_________________
_________________
_________________
_________________
_________________CompactedSubgradeslope1:36
50mm Broken Stones, 100mm thick
37.5mm Broken Stones, 100mm thick
Surface Course 20mm, 50mm thick
Figure 2:3: British roads
much importance for drainage. He also enunciated the necessity for continuous organized maintenance, instead of intermittent repairs if the roads were to be kept usable all times. For this he divided the roads between villages into sections of such length that an entire road could be covered by maintenance men living nearby.
2.2.4 British roads
6
The British government also gave importance to road construction. The British engineer John Macadam introduced what can be considered as the rst scienti c road construction method. Stone size was an important element of Macadam recipe. By empirical observation of many roads,he came to realize that 250 mm layers of well compacted broken angular stone would provide the same strength and sti ness and a better running surface than an expensive pavement founded on large stone blocks. Thus he introduced an economical method of road construction.
The mechanical interlock between the individual stone pieces provided strength and sti ness to the course. But the inter particle friction abraded the sharp interlocking faces and partly destroy the e ectiveness of the course. This e ect was overcome by introducing good quality interstitial ner material to produce a well-graded mix. Such mixes also proved less permeable and easier to compact. A typical cross section of British roads is given in Figure 2:3.
2.2.5 Modern roads
The modern roads by and large follow Macadam's construction method. Use of bituminous concrete and cement concrete are the most important developments. Various advanced and cost-e ective construction technologies are used. Development of new equipments help in the faster construction of roads. Many easily and locally available materials are tested in the laboratories and then implemented on roads for making economical and durable pavements.
Scope of transportation system has developed very largely. Population of the country is increasing day by day. The life style of people began to change. The need for travel to various places at faster speeds also increased. This increasing demand led to the emergence of other modes of transportation like railways and travel by air. While the above development in public transport sector was taking place,the development in private transport was at a much faster rate mainly because of its advantages like accessibility, privacy, exibility, convenience and comfort. This led to the increase in vehicular trafficespecially in private transport network. Thus road space available was becoming insu cient to meet the growing demand of trafficand congestion started. In addition, chances for accidents also increased. This has led to the increased attention towards control of vehicles so
that the transport infrastructure was optimally used. Various control measures like trafficsignals, providing roundabouts and medians, limiting the speed of vehicle at speci c zones etc. were implemented.
With the advancement of better roads and e cient control, more and more investments were made in the road sector especially after the World wars. These were large projects requiring large investment. For optimal utilization of funds, one should know the travel pattern and travel behavior. This has led to the emergence of transportation planning and demand management.
2.3 Highway planning in India
Excavations in the sites of Indus valley, Mohenjo-dero and Harappan civilizations revealed the existence of planned roads in India as old as 2500-3500 BC. The Mauryan kings also built very good roads. Ancient books like Arthashastra written by Kautilya, a great administrator of the Mauryan times, contained rules for regulating tra c, depths of roads for various purposes, and punishments for obstructing tra c.
During the time of Mughal period, roads in India were greatly improved. Roads linking North-West and the Eastern areas through gangetic plains were built during this time.
After the fall of the Mughals and at the beginning of British rule, many existing roads were improved. The construction of Grand-Trunk road connecting North and South is a major contribution of the British. However, the focus was later shifted to railways, except for feeder roads to important stations.
2.3.1 Modern developments
The rst World war period and that immediately following it found a rapid growth in motor transport. So need
7
for better roads became a necessity. For that, the Government of India appointed a committee called Road development Committee with Mr.M.R. Jayakar as the chairman. This committee came to be known as Jayakar committee.
Jayakar Committee
In 1927 Jayakar committee for Indian road development was appointed. The major recommendations and the resulting implementations were:
Committee found that the road development of the country has become beyond the capacity of local governments and suggested that Central government should take the proper charge considering it as a matter of national interest.
They gave more stress on long term planning programme, for a period of 20 years (hence called twenty year plan) that is to formulate plans and implement those plans with in the next 20 years.
One of the recommendations was the holding of periodic road conferences to discuss about road construc-tion and development. This paved the way for the establishment of a semi-o cial technical body called Indian Road Congress (IRC) in 1934
The committee suggested imposition of additional taxation on motor transport which includes duty on motor spirit, vehicle taxation, license fees for vehicles plying for hire. This led to the introduction of a development fund called Central road fund in 1929. This fund was intended for road development.
INTRODUCTION TO HIGHWAY ENGINEERING
A dedicated research organization should be constituted to carry out research and development work. This resulted in the formation of Central Road Research Institute (CRRI) in 1950.
Nagpur road congress 1943
The second World War saw a rapid growth in road trafficand this led to the deterioration in the condition of roads. To discuss about improving the condition of roads, the government convened a conference of chief engineers of provinces at Nagpur in 1943. The result of the conference is famous as the Nagpur plan.
A twenty year development programme for the period (1943-1963) was nalized. It was the rst attempt to prepare a co-ordinated road development programme in a planned manner.
The roads were divided into four classes:
National highways which would pass through states, and places having national importance for strategic, administrative and other purposes.
B) State highways which would be the other main roads of a state.
C) District roads which would take trafficfrom the main roads to the interior of the district . According to the importance, some are considered as major district roads and the remaining as other district roads.
{Village roads which would link the villages to the road system.
The committee planned to construct 2 lakh kms of road across the country within 20 years.
They recommended the construction of star and grid pattern of roads throughout the country.
One of the objective was that the road length should be increased so as to give a road density of 16kms per 100 sq.km
8
Bombay road congress 1961
The length of roads envisaged under the Nagpur plan was achieved by the end of it, but the road system was de cient in many respects. The changed economic, industrial and agricultural conditions in the country warranted a review of the Nagpur plan. Accordingly a 20-year plan was drafted by the Roads wing of Government of India, which is popularly known as the Bombay plan. The highlights of the plan were:
It was the second 20 year road plan (1961-1981)
The total road length targeted to construct was about 10 lakhs.
Rural roads were given speci c attention. Scienti c methods of construction was proposed for the rural roads. The necessary technical advice to the Panchayaths should be given by State PWD's.
They suggested that the length of the road should be increased so as to give a road density of 32kms/100 sq.km
The construction of 1600 km of expressways was also then included in the plan.
Lucknow road congress 1984
This plan has been prepared keeping in view the growth pattern envisaged in various elds by the turn of the century. Some of the salient features of this plan are as given below:
This was the third 20 year road plan (1981-2001). It is also called Lucknow road plan.
It aimed at constructing a road length of 12 lakh kilometres by the year 1981 resulting in a road density of 82kms/100 sq.km
The plan has set the target length of NH to be completed by the end of seventh, eighth and ninth ve year plan periods.
It aims at improving the transportation facilities in villages, towns etc. such that no part of country is farther than 50 km from NH.
One of the goals contained in the plan was that expressways should be constructed on major trafficcorridors to provide speedy travel.
Energy conservation, environmental quality of roads and road safety measures were also given due impor-tance in this plan.
9
CHAPTER 2
HIGHWAY GEOMETRIC DESIGN
Overview
The features of the cross-section of the pavement in uences the life of the pavement as well as the riding comfort and safety. Of these, pavement surface characteristics a ect both of these. Camber,kerbs, and geometry of various cross-sectional elements are important aspects to be considered in this regard. They are explained brie y in this chapter.
Pavement surface characteristics
For safe and comfortable driving four aspects of the pavement surface are important; the friction between the wheels and the pavement surface, smoothness of the road surface, the light re ection characteristics of the top of pavement surface, and drainage to water.
Friction
Friction between the wheel and the pavement surface is a crucial factor in the design of horizontal curves and thus the safe operating speed. Further, it also a ect the acceleration and deceleration ability of vehicles. Lack of adequate friction can cause skidding or slipping of vehicles.
Skidding happens when the path traveled along the road surface is more than the circumferential movement of the wheels due to friction
Slip occurs when the wheel revolves more than the corresponding longitudinal movement along the road. Various factors that a ect friction are:
Type of the pavement (like bituminous, concrete, or gravel), Condition of the pavement (dry or wet, hot or cold, etc),
Condition of the tyre (new or old), and Speed and load of the vehicle.
The frictional force that develops between the wheel and the pavement is the load acting multiplied by a factor called the coe cient of friction and denoted as f . The choice of the value of f is a very complicated issue since it depends on many variables. IRC suggests the coe cient of longitudinal friction as 0.35-0.4 depending on
the speed and coe cient of lateral friction as 0.15. The former is useful in sight distance calculation and the latter in horizontal curve design.
Unevenness
It is always desirable to have an even surface, but it is seldom possible to have such a one. Even if a road is constructed with high quality pavers, it is possible to develop unevenness due to pavement failures. Unevenness a ect the vehicle operating cost, speed, riding comfort, safety, fuel consumption and wear and tear of tyres.
Unevenness index is a measure of unevenness which is the cumulative measure of vertical undulations of the pavement surface recorded per unit horizontal length of the road. An unevenness index value less than 1500 mm/km is considered as good, a value less than 2500 mm.km is satisfactory up to speed of 100 kmph and values greater than 3200 mm/km is considered as uncomfortable even for 55 kmph.
c. barrier type
d. submerged
Figure 12:3: Di erent types of kerbs
Submerged kerbs : They are used in rural roads. The kerbs are provided at pavement edges between the pavement edge and shoulders. They provide lateral con nement and stability to the pavement.
Road margins
The portion of the road beyond the carriageway and on the roadway can be generally called road margin. Various elements that form the road margins are given below.
Shoulders
Shoulders are provided along the road edge and is intended for accommodation of stopped vehicles, serve as an emergency lane for vehicles and provide lateral support for base and surface courses. The shoulder should be strong enough to bear the weight of a fully loaded truck even in wet conditions. The shoulder width should be adequate for giving working space around a stopped vehicle. It is desirable to have a width of 4.6 m for the shoulders. A minimum width of 2.5 m is recommended for 2-lane rural highways in India.
Parking lanes
Parking lanes are provided in urban lanes for side parking. Parallel parking is preferred because it is safe for the vehicles moving on the road. The parking lane should have a minimum of 3.0 m width in the case of parallel parking.
Bus-bays
Bus bays are provided by recessing the kerbs for bus stops. They are provided so that they do not obstruct the movement of vehicles in the carriage way. They should be at least 75 meters away from the intersection so that the trafficnear the intersections is not a ected by the bus-bay.
Service roads
13
Service roads or frontage roads give access to access controlled highways like freeways and expressways. They run parallel to the highway and will be usually isolated by a separator and access to the highway will be provided only at selected points. These roads are provided to avoid congestion in the expressways and also the speed of the trafficin those lanes is not reduced.
Cycle track
Cycle tracks are provided in urban areas when the volume of cycle trafficis high Minimum width of 2 meter is required, which may be increased by 1 meter for every additional track.
Footpath
Footpaths are exclusive right of way to pedestrians, especially in urban areas. They are provided for the safety of the pedestrians when both the pedestrian trafficand vehicular trafficis high. Minimum width is 1.5 meter and may be increased based on the tra c. The footpath should be either as smooth as the pavement or more smoother than that to induce the pedestrian to use the footpath.
Guard rails
They are provided at the edge of the shoulder usually when the road is on an embankment. They serve to prevent the vehicles from running o the embankment, especially when the height of the ll exceeds 3 m. Various designs of guard rails are there. Guard stones painted in alternate black and white are usually used. They also give better visibility of curves at night under headlights of vehicles.
Width of formation
Width of formation or roadway width is the sum of the widths of pavements or carriage way including separators and shoulders. This does not include the extra land in formation/cutting. The values suggested by IRC are given in Table 12:3.
Table 12:3: Width of formation for various classed of roads
Road
Roadway width in m
classification
Plain and
Mountainous and
rolling terrain
steep terrain
NH/SH
12
6.25-8.8
MDR
9
4.75
ODR
7.5-9.0
4.75
VR
7.5
4.0
14
Right of way
Right of way (ROW) or land width is the width of land acquired for the road, along its alignment. It should be adequate to accommodate all the cross-sectional elements of the highway and may reasonably provide for future development. To prevent ribbon development along highways, control lines and building lines may be provided. Control line is a line which represents the nearest limits of future uncontrolled building activity in relation to a road. Building line represents a line on either side of the road, between which and the road no building activity is permitted at all. The right of way width is governed by:
Width of formation: It depends on the category of the highway and width of roadway and road margins. Height of embankment or depth of cutting: It is governed by the topography and the vertical alignment. Side slopes of embankment or cutting: It depends on the height of the slope, soil type etc.
Drainage system and their size which depends on rainfall, topography etc.
Sight distance considerations : On curves etc. there is restriction to the visibility on the inner side of the curve due to the presence of some obstructions like building structures etc.
Reserve land for future widening: Some land has to be acquired in advance anticipating future develop-ments like widening of the road.
Table 12:4: Normal right of way for open areas
Road
Roadway width in m
classi cation
Plain and
Mountainous and
rolling terrain
steep terrain
Open areas
NH/SH
45
24
MDR
25
18
ODR
15
15
VR
12
9
Built-up areas
NH/SH
30
20
MDR
20
15
ODR
15
12
VR
10
9
The importance of reserved land is emphasized by the following. Extra width of land is available for the construction of roadside facilities. Land acquisition is not possible later, because the land may be occupied for various other purposes (buildings, business etc.) The normal ROW requirements for built up and open areas as specified by IRC is given in Table 12:4
Sight distance
Overview
The safe and effcient operation of vehicles on the road depends very much on the visibility of the road ahead of the driver. Thus the geometric design of the road should be done such that any obstruction on the road length could be visible to the driver from some distance ahead. This distance is said to be the sight distance.
15
Types of sight distance
Sight distance available from a point is the actual distance along the road surface, over which a driver from a speci ed height above the carriage way has visibility of stationary or moving objects. Three sight distance situations are considered for design:
Stopping sight distance (SSD) or the absolute minimum sight distance
Intermediate sight distance (ISD) is de ned as twice SSD
Overtaking sight distance (OSD) for safe overtaking operation
Head light sight distance is the distance visible to a driver during night driving under the illumination of head lights
Safe sight distance to enter into an intersection.
The most important consideration in all these is that at all times the driver traveling at the design speed of the highway must have sufficient carriageway distance within his line of vision to allow him to stop his vehicle before colliding with a slowly moving or stationary object appearing suddenly in his own trafficlane.
The computation of sight distance depends on:
Reaction time of the driver
Reaction time of a driver is the time taken from the instant the object is visible to the driver to the instant when the brakes are applied. The total reaction time may be split up into four components based on PIEV theory. In practice, all these times are usually combined into a total perception-reaction time suitable for design purposes as well as for easy measurement. Many of the studies shows that drivers require about 1.5 to 2 secs under normal conditions. However, taking into consideration the variability of driver characteristics, a higher value is normally used in design. For example, IRC suggests a reaction time of 2.5 secs. Speed of the vehicle
The speed of the vehicle very much a ects the sight distance. Higher the speed, more time will be required to stop the vehicle. Hence it is evident that, as the speed increases, sight distance also increases.
Effciency of brakes
The efficiency of the brakes depends upon the age of the vehicle, vehicle characteristics etc. If the brakeffciency is 100%, the vehicle will stop the moment the brakes are applied. But practically, it is not possible to achieve 100% brake efficiencyTherefore the sight distance required will be more when the e ciency of brakes are less. Also for safe geometric design, we assume that the vehicles have only 50% brake efficiency.
Frictional resistance between the tyre and the road
The frictional resistance between the tyre and road plays an important role to bring the vehicle to stop. When the frictional resistance is more, the vehicles stop immediately. Thus sight required will be less. No separate provision for brake e ciency is provided while computing the sight distance. This is taken into account along with the factor of longitudinal friction. IRC has speci ed the value of longitudinal friction in between 0.35 to 0.4.
Gradient of the road.
Gradient of the road also a ects the sight distance. While climbing up a gradient, the vehicle can stop immediately. Therefore sight distance required is less. While descending a gradient, gravity also comes into action and more time will be required to stop the vehicle. Sight distance required will be more in this case.
16
Stopping sight distance
Stopping sight distance (SSD) is the minimum sight distance available on a highway at any spot having sufficient length to enable the driver to stop a vehicle traveling at design speed, safely without collision with any other obstruction.
There is a term called safe stopping distance and is one of the important measures in traffic engineering. It is the distance a vehicle travels from the point at which a situation is rst perceived to the time the deceleration is complete. Drivers must have adequate time if they are to suddenly respond to a situation. Thus in highway design, sight distance at least equal to the safe stopping distance should be provided. The stopping sight distance is the sum of lag distance and the braking distance. Lag distance is the distance the vehicle traveled during the reaction time t and is given by vt, where v is the velocity in m=sec2. Braking distance is the distance traveled by the vehicle during braking operation. For a level road this is obtained by equating the work done in stopping the vehicle and the kinetic energy of the vehicle. If F is the maximum frictional force developed and the braking distance is l, then work done against friction in stopping the vehicle is F l = f W l where W is the total weight of the vehicle. The kinetic energy at the design speed is
1
mv
2
=
1 W v2
2
2 g
f W l
=
W v2
2g
Therefore, the SSD = lag distance + braking distance and given by:
v2
SSD = vt +
(13.1)
2gf
where v is the design speed in m=sec2, t is the reaction time in sec, g is the acceleration due to gravity and f is the coe cient of friction. The coe cient of friction f is given below for various design speed. When there is an
Table 13:1: Coe cient of longitudinal friction
Speed, kmph
<30
40
50
60
>80
f
0.40
0.38
0.37
0.36
0.35
ascending gradient of say +n%, the component of gravity adds to braking action and hence braking distance is decreased. The component of gravity acting parallel to the surface which adds to the the braking force is equal to W sin W tan = W n=100. Equating kinetic energy and work done:
f W +
W n
l
=
W v2
100
2g
l
=
v2
2g f +
n
100
Similarly the braking distance can be derived for a descending gradient. Therefore the general equation is given by Equation 13.2.
SSD = vt +
v2
(13.2)
2g(f 0:01n)
17
Figure 13:1: Time-space diagram: Illustration of overtaking sight distance
Overtaking sight distance
The overtaking sight distance is the minimum distance open to the vision of the driver of a vehicle intending to overtake the slow vehicle ahead safely against the trafficin the opposite direction. The overtaking sight distance or passing sight distance is measured along the center line of the road over which a driver with his eye level 1.2 m above the road surface can see the top of an object 1.2 m above the road surface.
The factors that a ect the OSD are:
Velocities of the overtaking vehicle, overtaken vehicle and of the vehicle coming in the opposite direction.
Spacing between vehicles, which in-turn depends on the speed
Skill and reaction time of the driver
Rate of acceleration of overtaking vehicle
Gradient of the road
The dynamics of the overtaking operation is given in the gure which is a time-space diagram. The x-axis denotes the time and y-axis shows the distance traveled by the vehicles. The trajectory of the slow moving vehicle (B) is shown as a straight line which indicates that it is traveling at a constant speed. A fast moving vehicle (A) is traveling behind the vehicle B. The trajectory of the vehicle is shown initially with a steeper slope. The dotted line indicates the path of the vehicle A if B was absent. The vehicle A slows down to follow the vehicle B as shown in the gure with same slope from t0 to t1. Then it overtakes the vehicle B and occupies the left lane at time t3. The time duration T = t3 t1 is the actual duration of the overtaking operation. The snapshots of the road at time t0 ; t1, and t3 are shown on the left side of the gure. From the Figure 13:1, the overtaking sight distance consists of
Figure 13:3: Sight distance at intersections
Sight distance at intersections
At intersections where two or more roads meet, visibility should be provided for the drivers approaching the intersection from either sides. They should be able to perceive a hazard and stop the vehicle if required. Stopping sight distance for each road can be computed from the design speed. The sight distance should be provided such that the drivers on either side should be able to see each other. This is illustrated in the gure 13:3.
Design of sight distance at intersections may be used on three possible conditions:
Enabling approaching vehicle to change the speed
Enabling approaching vehicle to stop
Enabling stopped vehicle to cross a main road
21
Horizontal alignment
Design Speed
The design speed, as noted earlier, is the single most important factor in the design of horizontal alignment. The design speed also depends on the type of the road. For e.g, the design speed expected from a National highway will be much higher than a village road, and hence the curve geometry will vary signi cantly.
The design speed also depends on the type of terrain. A plain terrain can a ord to have any geometry, but for the same standard in a hilly terrain requires substantial cutting and lling implying exorbitant costs as well as safety concern due to unstable slopes. Therefore, the design speed is normally reduced for terrains with steep slopes.
For instance, Indian Road Congress (IRC) has classi ed the terrains into four categories, namely plain, rolling, mountainous, and steep based on the cross slope as given in table 14:1. Based on the type of road and type of terrain the design speed varies. The IRC has suggested desirable or ruling speed as well as minimum suggested design speed and is tabulated in table 14:2. The recommended design speed is given in Table 14:2.
Table 14:1: Terrain classi cation
Terrain classi cation
Cross slope (%)
Plain
0-10
Rolling
10-25
Mountainous
25-60
Steep
> 60
Table 14:2: Design speed in km=hr as per IRC (ruling and minimum
Type
Plain
Rolling
Hilly
Steep
NS&SH
100-80
80-65
50-40
40-30
MDR
80-65
65-50
40-30
30-20
ODR
65-50
50-40
30-25
25-20
VR
50-40
40-35
25-20
25-20
22
Horizontal curve
The presence of horizontal curve imparts centrifugal force which is a reactive force acting outward on a vehicle negotiating it. Centrifugal force depends on speed and radius of the horizontal curve and is counteracted to a certain extent by transverse friction between the tyre and pavement surface. On a curved road, this force tends to cause the vehicle to overrun or to slide outward from the centre of road curvature. For proper design of the curve, an understanding of the forces acting on a vehicle taking a horizontal curve is necessary. Various forces acting on the vehicle are illustrated in the gure 14:1.
CG P
W/2 W/2
b/2
A B
W
Ra Rb
Figure 14:1: E ect of horizontal curve
They are the centrifugal force (P) acting outward, weight of the vehicle (W) acting downward, and the reaction of the ground on the wheels (RA and RB ). The centrifugal force and the weight is assumed to be from the centre of gravity which is at h units above the ground. Let the wheel base be assumed as b units. The centrifugal force P in kg=m2 is given by
W v2
P =
(14.1)
gR
where W is the weight of the vehicle in kg, v is the speed of the vehicle in m=sec, g is the acceleration due to gravity in m=sec2 and R is the radius of the curve in m.
The centrifugal ratio or the impact factor
P
is given by:
W
P
v2
=
(14.2)
W
gR
The centrifugal force has two e ects: A tendency to overturn the vehicle about the outer wheels and a tendency for transverse skidding. Taking moments of the forces with respect to the outer wheel when the vehicle is just
about to override,
P h = W
b
or
P
=
b
W
2h
2
At the equilibrium over turning is possible when
v2 = b gR 2h
and for safety the following condition must satisfy:
b
v2
>
(14.3)
2h
gR
23
The second tendency of the vehicle is for transverse skidding. i.e. When the the centrifugal force P is greater than the maximum possible transverse skid resistance due to friction between the pavement surface and tyre. The transverse skid resistance (F) is given by:
F = FA + FB
f (RA + RB )
f W
where FA and FB is the fractional force at tyre A and B, RA and RB is the reaction at tyre A and B, f is the lateral coe cient of friction and W is the weight of the vehicle. This is counteracted by the centrifugal force (P), and equating:
P = f W or WP = f
At equilibrium, when skidding takes place (from equation14.2)
P = f = v2
W gR
and for safety the following condition must satisfy:
v2
f >
(14.4)
gR
Equation 14.3 and 14.4 give the stable condition for design. If equation 14.3 is violated, the vehicle will overturn at the horizontal curve and if equation 14.4 is violated, the vehicle will skid at the horizontal curve
Analysis of super-elevation
Super-elevation or cant or banking is the transverse slope provided at horizontal curve to counteract the cen-trifugal force, by raising the outer edge of the pavement with respect to the inner edge, throughout the length of the horizontal curve. When the outer edge is raised, a component of the curve weight will be complimented in counteracting the e ect of centrifugal force. In order to nd out how much this raising should be, the following analysis may be done. The forces acting on a vehicle while taking a horizontal curve with superelevation is shown in gure 14:2.
Forces acting on a vehicle on horizontal curve of radius R m at a speed of v m=sec2 are:
24
P cos
P sin
P
W cos
Fb
FA
W
W sin
Figure 14:2: Analysis of super-elevation
P the centrifugal force acting horizontally out-wards through the center of gravity, W the weight of the vehicle acting down-wards through the center of gravity, and
F the friction force between the wheels and the pavement, along the surface inward. At equilibrium, by resolving the forces parallel to the surface of the pavement we get,
P cos = W sin + FA + FB
2.2.6 W sin + f (RA + RB )
2.2.7 W sin + f (W cos + P sin )
where W is the weight of the vehicle, P is the centrifugal force, f is the coe cient of friction, is the transverse slope due to superelevation. Dividing by W cos , we get:
P cos
W cos
P
W WP (1 f tan )
2.4 W sin + f W cos + f P sin W cos W cos W cos
2.3.2 tan + f + f WP tan
2.3.3 tan + f
P
=
tan + f
(14.5)
W
1
f tan
We have already derived an expression for P/W.By substituting this in equation 14.5, we get:
v2
tan + f
=
(14.6)
gR
1 f tan
25
This is an exact expression for superelevation. But normally, f = 0:15 and < 4o, 1 f tan 1 and for small , tan sin = E=B = e, then equation 14.6 becomes:
e + f =
v2
(14.7)
gR
where, e is the rate of super elevation, f the coe cient of lateral friction 0:15, v the speed of the vehicle in m=sec2, R the radius of the curve in m and g = 9:8m=sec2.
Three speci c cases that can arise from equation 14.7 are as follows:
If there is no friction due to some practical reasons, then f = 0 and equation 14.7 becomes e = gRv2 . This results in the situation where the pressure on the outer and inner wheels are same; requiring very high super-elevation e.
12.4 If there is no super-elevation provided due to some practical reasons, then e = 0 and equation 14.7 becomes f = gRv2 . This results in a very high coe cient of friction.
p
3 If e = 0 and f = 0:15 then for safe traveling speed from equation 14.7 is given by vb = f gR where vb is the restricted speed.
Design of super-elevation
For fast moving vehicles, providing higher superelevation without considering coe cient of friction is safe, i.e. centrifugal force is fully counteracted by the weight of the vehicle or superelevation. For slow moving vehicles, providing lower superelevation considering coe cient of friction is safe, i.e.centrifugal force is counteracted by superelevation and coe cient of friction . IRC suggests following design procedure:
Step 1 Find e for 75 percent of design speed, neglecting f , i.e e1 = (0:75v)2 .
gR
If e1 0:07, then e = e1 =
(0:75v)2
Step 2
gR
, else if e1 > 0:07 go to step 3.
2
2
Step 3
Find f1 for the design speed and max e, i.e f1 =
v
e =
v
0:07. If f1
< 0:15, then the maximum
gR
gR
e = 0:07 is safe for the design speed, else go to step 4.
Step 4
Find the allowable speed va for the maximum e = 0:07 and f = 0:15, va =
0:22gR If vav then the
design is adequate, otherwise use speed adopt control measures or look for speed control measures.
26
Maximum and minimum super-elevation
Depends on (a) slow moving vehicle and (b) heavy loaded trucks with high CG. IRC speci es a maximum super-elevation of 7 percent for plain and rolling terrain, while that of hilly terrain is 10 percent and urban road is 4 percent. The minimum super elevation is 2-4 percent for drainage purpose, especially for large radius of the horizontal curve.
2.2.4 Attainment of super-elevation
2.2.5 Elimination of the crown of the cambered section by:
rotating the outer edge about the crown : The outer half of the cross slope is rotated about the crown at a desired rate such that this surface falls on the same plane as the inner half.
shifting the position of the crown: This method is also known as diagonal crown method. Here the position of the crown is progressively shifted outwards, thus increasing the width of the inner half of cross section progressively.
2.2.6 Rotation of the pavement cross section to attain full super elevation by:There are two methods of attaining superelevation by rotating the pavement
rotation about the center line : The pavement is rotated such that the inner edge is depressed and the outer edge is raised both by half the total amount of superelevation, i.e., by E=2 with respect to the centre.
rotation about the inner edge: Here the pavement is rotated raising the outer edge as well as the centre such that the outer edge is raised by the full amount of superelevation with respect to the inner edge.
Radius of Horizontal Curve
The radius of the horizontal curve is an important design aspect of the geometric design. The maximum comfortable speed on a horizontal curve depends on the radius of the curve. Although it is possible to design the curve with maximum superelevation and coe cient of friction, it is not desirable because re-alignment would be required if the design speed is increased in future. Therefore, a ruling
17:99m=sec = 17:99 3:6 = 64kmph
29
(a) e if full lateral friction is assumed to develop [Ans: 0.047]
(b) nd f needed if no super elevation is provide [Ans: 0.197]
(c) Find equilibrium super-elevation if pressure on inner and outer outer wheel should be equal (Hint: f=0) [Ans: 0.197]
3. 3.Two lane road, V=80 kmph, R=480 m, Width of the pavement at the horizontal curve=7.5 m. (i) Design super elevation for mixed tra c. (ii) By how much the outer edge of the pavement is to be raised with respect to the centerline, if the pavement is rotated with respect to centerline. [Ans:(i) 0.059 (ii) 0.22m]
4. 4.Design rate of super elevation for a horizontal highway curve of radius 500 m and speed 100 kmph. [Ans: e=0.07, f=0.087 and with in limits]
5. Given V=80 kmph, R=200m Design for super elevation. (Hint: f=0.15) [Ans: Allowable speed is 74.75 kmph and e=0.07]
6. 5.Calculate the ruling minimum and absolute minimum radius of horizontal curve of a NH in plain terrain. (Hint: Vruling =100kmph, Vmin =80kmph., e=0.07, f=0.15) [Ans: 360 and 230 m]
7. 6.Find the extra widening for W=7m, R=250m, longest wheel base, l=7m, V=70kmph. (Hint: n=2) [Ans:0.662m]
8. 7.Find the width of a pavement on a horizontal curve for a new NH on rolling terrain. Assume all
data. (Hint: V=80kmph for rolling terrain, normal W=7.0m, n=2, l=6.0m, e=0.07, f=0.15). [Ans: Rruling =230m, We=0.71, W at HC=7.71m]
Horizontal Transition Curves
Transition curve is provided to change the horizontal alignment from straight to circular curve gradually and has a radius which decreases from in nity at the straight end (tangent point) to the desired radius of the circular curve at the other end (curve point) There are ve objectives for providing transition curve and are given below:
12.2.1 to introduce gradually the centrifugal force between the tangent point and the beginning of the circular curve, avoiding sudden jerk on the vehicle.This increases the comfort of passengers.
12.2.2 to enable the driver turn the steering gradually for his own comfort and security,
12.2.3 to provide gradual introduction of super elevation, and
12.2.4 to provide gradual introduction of extra widening.
12.2.5 to enhance the aesthetic appearance of the road.
Type of transition curve
Di erent types of transition curves are spiral or clothoid, cubic parabola, and Lemniscate. IRC recommends spiral as the transition curve because:
it ful lls the requirement of an ideal transition curve, that is;
rate of change or centrifugal acceleration is consistent (smooth) and
radius of the transition curve is 1 at the straight edge and changes to R at the curve point (Ls / R1 ) and calculation and eld implementation is very easy.
30
Length of transition curve
The length of the transition curve should be determined as the maximum of the following three criteria: rate of change of centrifugal acceleration, rate of change of superelevation, and an empirical formula given by IRC.
1. Rate of change of centrifugal acceleration
At the tangent point, radius is in nity and hence centrifugal acceleration is zero. At the end of the transition, the radius R has minimum value R. The rate of change of centrifugal acceleration should be adopted such that the design should not cause discomfort to the drivers. If c is the rate of change of centrifugal acceleration, it can be written as:
2
c =
vR
0
;
t
v2
=
R
;
Ls
v
v3
=
:
LsR
Therefore, the length of the transition curve Ls1 in m is
v3
Ls1
=
;
(16.1)
cR
where c is the rate of change of centrifugal acceleration given by an empirical formula suggested by by IRC as below:
c
=
80
;
(16.2)
75 + 3:6v
subject to :
cmin
=
0:5;
cmax
=
0:8:
2. Rate of introduction of super-elevation
Raise (E) of the outer edge with respect to inner edge is given by E = eB = e(W + We ). The rate of change of this raise from 0 to E is achieved gradually with a gradient of 1 in N over the length of the transition curve (typical range of N is 60-150). Therefore, the length of the transition curve Ls2 is:
Ls2 = N e(W + We )
3. By empirical formula
IRC suggest the length of the transition curve is minimum for a plain and rolling terrain:
35v2
Ls3 = R
and for steep and hilly terrain is:
12:96v2
Ls3
=
R
and the shift s as:
Ls2
s =
24R
The length of the transition curve Ls is the maximum of equations 16.1, 16.3 and 16.4or16.5, i.e.
Ls = Max : (Ls1 ; Ls2 ; Ls3 )
(16.3)
(16.4)
(16.5)
(16.6)
(16.7)
31
Setback Distance
Setback distance m or the clearance distance is the distance required from the centerline of a horizontal curve to an obstruction on the inner side of the curve to provide adequate sight distance at a horizontal curve. The setback distance depends on:
15.4 sight distance (OSD, ISD and OSD),
15.5 radius of the curve, and
15.6 length of the curve.
Case (a) Ls < Lc
For single lane roads:
s
= radians
R
=
180s
degrees
R
=2 =
180s
degrees
(16.8)
2 R
Therefore,
m = R R cos
(16.9)
2
For multi lane roads, if d is the distance between centerline of the road and the centerline of the inner lane, then
m = R (R d) cos
180s
(16.10)
2 (R d)
m = R R cos
(16.11)
2
Case (b) Ls > Lc
For single lane:
m1 m2
15.4.1 R R cos( =2)
15.4.2 (S Lc) sin( =2) 2
The set back is the sum of m1 and m2 given by:
where = 180Lc .
2 2 R
m = R R cos( =2) +
(S Lc)
sin( =2)
(16.12)
2
For multi-lane road =
180Lc
, and m is given by
2 (R d)
2
m = R (R d) cos( =2) +
(S Lc)
sin( =2)
(16.13)
2
32
SD
D
m
A
C
B
__________
__________
__________
__________
__________
__________
__________
__________
__________
R
R
a/2
Figure 16:1: Set-back for single lane roads (Ls < Lc)
centre line of the road
d
m’ m
line of sight
centre line
R
of inner lane
2
Figure 16:2: Set-back for multi-lane roads (Ls < Lc)
33
L
(S−L)/2
m2
(S−L)/2
=2
m1
R
=2
Figure 16:3: Set back for single lane roads (Ls < Lc)
S Q
T cos
T
C
P
D
A B
Figure 16:4: Curve resistance
Curve Resistance
When the vehicle negotiates a horizontal curve, the direction of rotation of the front and the r ear wheels are di erent. The front wheels are turned to move the vehicle along the curve, whereas the rear wheels seldom turn. This is illustrated in gure 16:4. The rear wheels exert a tractive force T in the PQ direction . The tractive force available on the front wheels is T cos in the PS direction as shown in the gure 16:4. This is less than the actual tractive force, T applied. Hence, the loss of tractive force for a vehicle to negotiate a horizontal curve is:
CR = TT cos
(16.14)
Gradient
Gradient is the rate of rise or fall along the length of the road with respect to the horizontal. While aligning a highway, the gradient is decided for designing the vertical curve. Before nalizing the gradients, the construction cost, vehicular operation cost and the practical problems in the site also has to be considered. Usually steep gradients are avoided as far as possible because of the di culty to climb and increase in the construction cost. More about gradients are discussed below.
34
Effect of gradient
The e ect of long steep gradient on the vehicular speed is considerable. This is particularly important in roads where the proportion of heavy vehicles is signi cant. Due to restrictive sight distance at uphill gradients the speed of trafficis often controlled by these heavy vehicles. As a result, not only the operating costs of the vehicles are increased, but also capacity of the roads will have to be reduced. Further, due to high di erential speed between heavy and light vehicles, and between uphill and downhill gradients, accidents abound in gradients.
Representation of gradient
The positive gradient or the ascending gradient is denoted as +n and the negative gradient as n. The deviation angle N is: when two grades meet, the angle which measures the change of direction and is given by the algebraic di erence between the two grades (n1 ( n2)) = n1 + n2 = 1 + 2. Example: 1 in 30 = 3.33% 2o is a steep gradient, while 1 in 50 = 2% 1o 100 is a atter gradient. The gradient representation is illustrated in the gure 17:1.
n
1
N
100
Figure 17:1: Representation of gradient
Terrain
Ruling
Limitings
Exceptional
Plain/Rolling
3.3
5.0
6.7
Hilly
5.0
6.0
7.0
Steep
6.0
7.0
8.0
Table 17:1: IRC Specifications for gradients for different roads
Types of gradient
Many studies have shown that gradient upto seven percent can have considerable e ect on the speeds of the passenger cars. On the contrary, the speeds of the heavy vehicles are considerably reduced when long gradients as at as two percent is adopted. Although, atter gradients are desirable, it is evident that the cost of construction will also be very high. Therefore, IRC has speci ed the desirable gradients for each terrain. However, it may not be economically viable to adopt such gradients in certain locations, steeper gradients are permitted for short duration. Di erent types of grades are discussed below and the recommended type of gradients for each type of terrain and type of gradient is given in table 17:1.
Ruling gradient, limiting gradient, exceptional gradient and minimum gradient are some types of gradients which are discussed below.
Ruling gradient
The ruling gradient or the design gradient is the maximum gradient with which the designer attempts to design the vertical pro le of the road. This depends on the terrain, length of the grade, speed, pulling power of the vehicle and the presence of the horizontal curve. In atter terrain, it may be possible to provide at gradients, but in hilly terrain it
35
is not economical and sometimes not possible also. The ruling gradient is adopted by the designer by considering a particular speed as the design speed and for a design vehicle with standard dimensions. But our country has a heterogeneous trafficand hence it is not possible to lay down precise standards for the country as a whole. Hence IRC has recommended some values for ruling gradient for di erent types of terrain.
Limiting gradient
This gradient is adopted when the ruling gradient results in enormous increase in cost of construction. On rolling terrain and hilly terrain it may be frequently necessary to adopt limiting gradient. But the length of the limiting gradient stretches should be limited and must be sandwiched by either straight roads or easier grades.
Exceptional gradient
Exceptional gradient are very steeper gradients given at unavoidable situations. They should be limited for short stretches not exceeding about 100 metres at a stretch. In mountainous and steep terrain, successive exceptional gradients must be separated by a minimum 100 metre length gentler gradient. At hairpin bends, the gradient is restricted to 2.5%.
Critical length of the grade
The maximum length of the ascending gradient which a loaded truck can operate without undue reduction in speed is called critical length of the grade. A speed of 25 kmph is a reasonable value. This value depends on the size, power, load, grad-ability of the truck, initial speed, nal desirable minimum speed etc.
Minimum gradient
This is important only at locations where surface drainage is important. Camber will take care of the lateral drainage. But the longitudinal drainage along the side drains require some slope for smooth ow of water. Therefore minimum gradient is provided for drainage purpose and it depends on the rain fall, type of soil and other site conditions. A minimum of 1 in 500 may be sufficient for concrete drain and 1 in 200 for open soil drains are found to give satisfactory performance..
Creeper lane
When the uphill climb is extremely long, it may be desirable to introduce an additional lane so as to allow slow ascending vehicles to be removed from the main stream so that the fast moving vehicles are not Affected. Such a newly introduced lane is called creeper lane. There are no hard and fast rules as when to introduce a creeper lane. But generally, it can be said that it is desirable to provide a creeper lane when the speed of the vehicle gets reduced to half the design speed. When there is no restrictive sight distance to reduce the speed of the approaching vehicle, the additional lane may be initiated at some distance uphill from the beginning of the slope. But when the restrictions are responsible for the lowering of speeds, obviously the lane should be initiated at a point closer to the bottom of the hill. Also the creeper lane should end at a point well beyond the hill crest, so that the slow moving vehicles can return back to the normal lane without any danger. In addition, the creeper lane should not end suddenly, but only in a tapered manner for efficient as well as safer transition of vehicles to the normal lane.
Grade compensation
While a vehicle is negotiating a horizontal curve, if there is a gradient also, then there will be increased resistance to traction due to both curve and the gradient. In such cases, the total resistance should not exceed the resistance due to gradient specified. For the design, in some cases this maximum value is limited to the ruling gradient
Figure 17:2: Types of summit curves
and in some cases as limiting gradient. So if a curve need to be introduced in a portion which has got the maximum permissible gradient, then some compensation should be provided so as to decrease the gradient for overcoming the tractive loss due to curve. Thus grade compensation can be de ned as the reduction in gradient at the horizontal curve because of the additional tractive force required due to curve resistance (T T cos ), which is intended to o set the extra tractive force involved at the curve. IRC gave the following specification for the grade compensation.
1. Grade compensation is not required for grades flatter than 4% because the loss of tractive force is negligible.
2. Grade compensation is 30+R %, where R is the radius of the horizontal curve in meters.
Figure 18:1: Types of valley curve
1. when a descending gradient meets another descending gradient [ gure 18:1a].
2. when a descending gradient meets a at gradient [ gure 18:1b].
3. when a descending gradient meets an ascending gradient [ gure 18:1c].
4. when an ascending gradient meets another ascending gradient [ gure 18:1d].
L/2
L/2
A C
N
B
Figure 18:2: Valley curve details
Design considerations
There is no restriction to sight distance at valley curves during day time. But visibility is reduced during night. In the absence or inadequacy of street light, the only source for visibility is with the help of headlights. Hence valley curves are designed taking into account of headlight distance. In valley curves, the centrifugal force will be acting downwards along with the weight of the vehicle, and hence impact to the vehicle will be more. This will result in jerking of the vehicle and cause discomfort to the passengers. Thus the most important design factors considered in valley curves are: (1) impact-free movement of vehicles at design speed and (2) availability of stopping sight distance under headlight of vehicles for night driving.
For gradually introducing and increasing the centrifugal force acting downwards, the best shape that could be given for a valley curve is a transition curve. Cubic parabola is generally preferred in vertical valley curves. See gure 18:2.
During night, under headlight driving condition, sight distance reduces and availability of stopping sight distance under head light is very important. The head light sight distance should be at least equal to the stopping sight distance. There is no problem of overtaking sight distance at night since the other vehicles with headlights could be seen from a considerable distance.
Length of the valley curve
The valley curve is made fully transitional by providing two similar transition curves of equal length The
transitional curve is set out by a cubic parabola y = bx3 where b = 2N The length of the valley transition curve
3L2
is designed based on two criteria:
1. comfort criteria; that is allowable rate of change of centrifugal acceleration is limited to a comfortable
39
level of about 0:6m=sec3.
2. safety criteria; that is the driver should have adequate headlight sight distance at any part of the country.
Comfort criteria
The length of the valley curve based on the rate of change of centrifugal acceleration that will ensure comfort: Let c is the rate of change of acceleration, R the minimum radius of the curve, v is the design speed and t is
the time, then c is given as:
where L is the total length of valley curve, N is the deviation angle in radians or tangent of the deviation angle or the algebraic di erence in grades, and c is the allowable rate of change of centrifugal acceleration which may be taken as 0:6m=sec3.
Safety criteria
Length of the valley curve for headlight distance may be determined for two conditions: (1) length of the valley curve greater than stopping sight distance and (2) length of the valley curve less than the stopping sight distance.
Case 1 Length of valley curve greater than stopping sight distance (L > S)
The total length of valley curve L is greater than the stopping sight distance SSD. The sight distance available will be minimum when the vehicle is in the lowest point in the valley. This is because the beginning of the curve will have in nite radius and the bottom of the curve will have minimum radius which is a property of the transition curve. The case is shown in gure 18:3. From the geometry of the gure, we have:
h1 + S tan
Note that the above expression is approximate and is satisfactory because in practice, the gradients are very small and is acceptable for all practical purposes. We will not be able to know prior to which case to be adopted. Therefore both has to be calculated and the one which satis es the condition is adopted.
42
CHAPTER III
Traffic Engineering & Regulation
Overview
Unlike many other disciplines of the engineering, the situations that are interesting to a trafficengineer cannot be reproduced in a laboratory. Even if road and vehicles could be set up in large laboratories, it is impossible to simulate the behavior of drivers in the laboratory. Therefore, trafficstream characteristics need to be collected only from the eld. There are several methods of data collection depending on the need of the study and some important ones are described in this chapter.
Data requirements
The most important trafficcharacteristics to be collected from the eld includes sped, travel time, ow and density. Some cases, spacing and headway are directly measured. In addition, the occupancy, ie percentage of time a point on the road is occupied by vehicles is also of interest. The measurement procedures can be classi ed based on the geographical extent of the survey into ve categories: (a) measurement at point on the road, (b) measurement over a short section of the road (less than 500 metres) (c) measurement over a length of the road (more than about 500 metres) (d) wide area samples obtained from number of locations, and (e) the use of an observer moving in the trafficstream. In each category, numerous data collection are there. However, important and basic methods will be discussed.
Measurements at a point
The most important point measurement is the vehicle volume count. Data can be collected manually or automatically. In manual method, the observer will stand at the point of interest and count the vehicles with the help of hand tallies. Normally, data will be collected for short interval of 5 minutes or 15 minutes etc. and for each types of vehicles like cars, two wheelers, three wheelers, LCV, HCV, multi axle trucks, nonmotorised trafficlike bullock cart, hand cart etc. From the ow data, ow and headway can be derived.
Modern methods include the use of inductive loop detector, video camera, and many other technologies. These methods helps to collect accurate information for long duration. In video cameras, data is collected from the eld and is then analyzed in the lab for obtaining results. Radars and microwave detectors are used to obtain the speed of a vehicle at a point. Since no length is involved, density cannot be obtained by measuring at a point.
43
x
enoscope
observer
Base length
Figure 32:1: Illustration of measurement over short section using enoscope
Measurements over short section
The main objective of this study is to nd the spot speed of vehicles. Manual methods include the use of enoscope. In this method a base length of about 30-90 metres is marked on the road. Enoscope is placed at one end and observer will stand at the other end. He could see the vehicle passing the farther end through enoscope and starts the stop watch. Then he stops the stop watch when the vehicle passes in front of him. The working of the enoscope is shown in gure 32:1.
An alternative method is to use pressure contact tube which gives a pressure signal when vehicle moves at either end. Another most widely used method is inductive loop detector which works on the principle of magnetic inductance. Road will be cut and a small magnetic loop is placed. When the metallic content in the vehicle passes over it, a signal will be generated and the count of the vehicle can be found automatically. The advantage of this detector is that the counts can be obtained throughout the life time of the road. However, chances of errors are possible because noise signals may be generated due to heavy vehicle passing adjacent lanes. When dual loops are used and if the spacing between them is known then speed also can be calculated in addition to the vehicle cost.
Measurements over long section
This is normally used to obtain variations in speed over a stretch of road. Usually the stretch will be having a length more than 500 metres. We can also get density. Most traditional method uses aerial photography. From a single frame, density can be measured, but not speed or volumes. In time lapse photography, several frames are available. If several frames are obtained over short time intervals, speeds can be measured from the distance covered between the two frames and time interval between them.
Moving observer method for stream measurement
Determination of any of the two parameters of the trafficow will provide the third one by the equation q = u:k. Moving observer method is the most commonly used method to get the relationship between the fundamental stream characteristics. In this method, the observer moves in the trafficstream unlike all other previous methods.
Consider a stream of vehicles moving in the north bound direction. Two di erent cases of motion can be considered. The rst case considers the trafficstream to be moving and the observer to be stationary. If no is
44
l
Figure 32:2: Illustration of moving observer method
the number of vehicles overtaking the observer during a period, t, then ow q is nt0 , or
n0 = qt
(32.1)
The second case assumes that the stream is stationary and the observer moves with speed vo . If np is the
number of vehicles overtaken by observer over a length l, then by de nition, density k is
np
, or
l
np = kl
(32.2)
or
np = k:vo :t
(32.3)
where v0 is the speed of the observer and t is the time taken for the observer to cover the road stretch. Now consider the case when the observer is moving within the stream. In that case mo vehicles will overtake the observer and mp vehicles will be overtaken by the observer in the test vehicle. Let the di erence m is given by m0 - mp, then from equation 32.5 and equation 32.7,
m = q:tk:vo :t
(32.4)
This equation is the basic equation of moving observer method, which relates q; k to the counts m, t and vo that can be obtained from the test. However, we have two unknowns, q and k, but only one equation. For generating another equation, the test vehicle is run twice once with the trafficstream and another one against traffic stream, i.e.
mw
= q:tw + k:vw
45
=
q:tw + k:l
ma =
qtak:va:ta
=
q:tak:l
where, a; w denotes against and with trafficow. It may be noted that the sign of equation 32.5 is negative, because test vehicle moving in the opposite direction can be considered as a case when the test vehicle is moving in the stream with negative velocity. Further, in this case, all the vehicles will be overtaking, since it is moving with negative speed. In other words, when the test vehicle moves in the opposite direction, the observer simply counts the number of vehicles in the opposite direction. Adding equation 32.5 and 32.5, we will get the rst parameter of the stream, namely the ow(q) as:
q =
mw + ma
(32.5)
tw + ta
Now calculating space mean speed from equation 32.5,
mw
=
qk:vw :t
tw
=
q
q
vw
v
=
q
q
l
v
tw
=
q(1
l
1
)
v
tw
=
q(1
tavg
)
tw
If vs is the mean stream speed, then average travel time is given by tavg =
l
. Therefore,
vs
mw
=
tw (1
tavg
) = tw tavg
q
tw
mw
l
tavg
=
tw
=
;
q
v
Rewriting the above equation, we get the second parameter of the traffic ow, namely the mean speed vs and
can be written as,
vs =
l
(32.6)
tw
mw
q
Thus two parameters of the stream can be determined. Knowing the two parameters the third parameter of trafficow density (k) can be found out as
k =
q
(32.7)
vs
For increase accuracy and reliability, the test is performed a number of times and the average results are to be taken.
Example 1
The length of a road stretch used for conducting the moving observer test is 0.5 km and the speed with which the test vehicle moved is 20 km/hr. Given that the number of vehicles encountered in the stream while the test
46
ma +mw
l
q
Sample no.
ma
mo
mp
m(momp)
ta
tw
q =
ta +tw
u = twqa
k = v
m
1
107
10
74
-64
0.025
0.025
860
5.03
171
2
113
25
41
-16
0.025
0.025
1940
15.04
129
3
30
15
5
10
0.025
0.025
800
40
20
4
79
18
9
9
0.025
0.025
1760
25.14
70
vehicle was moving against the trafficstream is 107, number of vehicles that had overtaken the test vehicle is 10, and the number of vehicles overtaken by the test vehicle is 74, nd the ow, density and average speed of the stream.
Solution Time taken by the test vehicle to reach the other end of the stream while it is moving along with
the trafficis tw = 0:5 = 0.025 hr Time taken by the observer to reach the other end of the stream while it is
20
107+(10 74)
moving against the trafficis ta = tw = 0.025 hr Flow is given by equation, q =
0:025+0:025 = 860 veh/hr Stream
speed vs can be found out from equationvs =
0:5
= 5 km/hr Density can be found out from equation as
10:74
0:025860
k = 860 = 172veh/km
5
Example 2
The data from four moving observer test methods are shown in the table. Column 1 gives the sample number, column 2 gives the number of vehicles moving against the stream, column 3 gives the number of vehicles that had overtaken the test vehicle, and last column gives the number of vehicles overtaken by the test vehicle. Find the three fundamental stream parameters for each set of data. Also plot the fundamental diagrams of trafficow.
Sample no.
1
2
3
1
107
10
74
2
113
25
41
3
30
15
5
4
79
18
9
Solution From the calculated values of ow, density and speed, the three fundamental diagrams can be plotted as shown in gure 32:3.
Figure 32:3: Fundamental diagrams of traffic flow
Traffic signs
Traffic control device is the medium used for communicating between trafficengineer and road users. Unlike other modes of transportation, there is no control on the drivers using the road. Here trafficcontrol devices comes to the help of the trafficengineer. The major types of trafficcontrol devices used are- trafficsigns, road markings , traffc signals and parking control. This chapter discusses trafficcontrol signs. Di erent types of trafficsigns are regulatory signs, warning signs and informatory signs.
Requirements of traffic control devices
5. The control device should ful ll a need : Each device must have a speci c purpose for the safe and
47
e cient operation of trafficow. The super uous devices should not be used.
6. It should command attention from the road users: This a ects the design of signs. For commanding attention, proper visibility should be there. Also the sign should be distinctive and clear. The sign should be placed in such a way that the driver requires no extra e ort to see the sign.
7. It should convey a clear, simple meaning: Clarity and simplicity of message is essential for the driver to properly understand the meaning in short time. The use of color, shape and legend as codes becomes important in this regard. The legend should be kept short and simple so that even a less educated driver could understand the message in less time.
8. Road users must respect the signs: Respect is commanded only when the drivers are conditioned to expect that all devices carry meaningful and important messages. Overuse, misuse and confusing messages of devices tends the drivers to ignore them.
9. The control device should provide adequate time for proper response from the road users: This is again related to the design aspect of trafficcontrol devices. The sign boards should be placed at a distance such that the driver could see it and gets su cient time to respond to the situation. For example, the STOP sign which is always placed at the stop line of the intersection should be visible for atleast one safe stopping sight distance away from the stop line.
Communication tools
A number of mechanisms are used by the trafficengineer to communicate with the road user. These mecha-nisms recognize certain human limitations, particularly eyesight. Messages are conveyed through the following elements.
18.2.2 Color: It is the rst and most easily noticed characteristics of a device. Usage of di erent colors for di erent signs are important. The most commonly used colors are red, green, yellow, black, blue, and brown . These are used to code certain devices and to reinforce speci c messages. Consistent use of colors helps the drivers to identify the presence of sign board ahead.
18.2.3 Shape : It is the second element discerned by the driver next to the color of the device. The categories of shapes normally used are circular, triangular, rectangular, and diamond shape. Two exceptional shapes used in trafficsigns are octagonal shape for STOP sign and use of inverted triangle for GIVE WAY (YIELD) sign. Diamond shape signs are not generally used in India.
18.2.4 Legend : This is the last element of a device that the drive comprehends. This is an important aspect in the case of trafficsigns. For the easy understanding by the driver, the legend should be short, simple and speci c so that it does not divert the attention of the driver. Symbols are normally used as legends so that even a person unable to read the language will be able to understand that. There is no need of it in the case of trafficsignals and road markings.
18.2.5 Pattern: It is normally used in the application of road markings, complementing trafficsigns. Generally solid, double solid and dotted lines are used. Each pattern conveys di erent type of meaning. The frequent and consistent use of pattern to convey information is recommended so that the drivers get accustomed to the di erent types of markings and can instantly recognize them.
Types of traffic signs
There are several hundreds of trafficsigns available covering wide variety of trafficsituations. They can be classi ed into three main categories.
Regulatory signs: These signs require the driver to obey the signs for the safety of other road users.
48
Warning signs:These signs are for the safety of oneself who is driving and advice the drivers to obey these signs.
Informative signs: These signs provide information to the driver about the facilities available ahead, and the route and distance to reach the speci c destinations
In addition special type of trafficsign namely work zone signs are also available. These type of signs are used to give warning to the road users when some construction work is going on the road. They are placed only for short duration and will be removed soon after the work is over and when the road is brought back to its normal condition. The rst three signs will be discussed in detail below.
Regulatory signs
These signs are also called mandatory signs because it is mandatory that the drivers must obey these signs. If the driver fails to obey them, the control agency has the right to take legal action against the driver. These signs are primarily meant for the safety of other road users. These signs have generally black legend on a white background. They are circular in shape with red borders. The regulatory signs can be further classi ed into :
1. Right of way series: These include two unique signs that assign the right of way to the selected approaches of an intersection. They are the STOP sign and GIVE WAY sign For example, when one minor road and major road meets at an intersection, preference should be given to the vehicles passing through the major road. Hence the give way sign board will be placed on the minor road to inform the driver on the minor road that he should give way for the vehicles on the major road. In case two major roads are meeting, then the trafficengineer decides based on the trafficon which approach the sign board has to be placed. Stop sign is another example of regulatory signs that comes in right of way series which requires the driver to stop the vehicle at the stop line.
2. Speed series: Number of speed signs may be used to limit the speed of the vehicle on the road. They include typical speed limit signs, truck speed, minimum speed signs etc. Speed limit signs are placed to limit the speed of the vehicle to a particular speed for many reasons. Separate truck speed limits are applied on high speed roadways where heavy commercial vehicles must be limited to slower speeds than passenger cars for safety reasons. Minimum speed limits are applied on high speed roads like expressways, freeways etc. where safety is again a predominant reason. Very slow vehicles may present hazard to themselves and other vehicles also.
3. Movement series: They contain a number of signs that a ect speci c vehicle maneuvers. These include turn signs, alignment signs, exclusion signs, one way signs etc. Turn signs include turn prohibitions and lane use control signs. Lane use signs make use of arrows to specify the movements which all vehicles in the lane must take. Turn signs are used to safely accommodate turns in unsignalized intersections.
4. Parking series: They include parking signs which indicate not only parking prohibitions or restrictions, but also indicate places where parking is permitted, the type of vehicle to be parked, duration for parking etc.
5. Pedestrian series: They include both legend and symbol signs. These signs are meant for the safety of pedestrians and include signs indicating pedestrian only roads, pedestrian crossing sites etc.
6. Miscellaneous: Wide variety of signs that are included in this category are: a "KEEP OF MEDIAN" sign, signs indicating road closures, signs restricting vehicles carrying hazardous cargo or substances, signs indicating vehicle weight limitations etc.
Some examples of the regulatory signs are shown in gure 36:1. They include a stop sign, give way sign,
49
signs for no entry, sign indicating prohibition for right turn, vehicle width limit sign, speed limit sign etc.
Warning signs
Warning signs or cautionary signs give information to the driver about the impending road condition. They advice the driver to obey the rules. These signs are meant for the own safety of drivers. They call for extra vigilance from the part of drivers. The color convention used for this type of signs is that the legend will be black
______________ ______________ ______________ ______________ ______________ ______________
_ _ _ _ _
_______STOP____________________________________________
______________ ______________ ______________ ______________ ______________ ______________
GIVE
WAY
2 M _
50
Figure 36:1: Examples of regulatory signs ( stop sign, give way sign, signs for no entry, sign indicating prohibition for right turn, vehicle width limit sign, speed limit sign)
_
Figure 36:2: Examples of cautionary signs ( right hand curve sign board, signs for narrow road, sign indicating railway track ahead)
in color with a white background. The shape used is upward triangular or diamond shape with red borders. Some of the examples for this type of signs are given in g 36:2 and includes right hand curve sign board, signs for narrow road, sign indicating railway track ahead etc.
Informative signs
Informative signs also called guide signs, are provided to assist the drivers to reach their desired destinations. These are predominantly meant for the drivers who are unfamiliar to the place. The guide signs are redundant for the users who are accustomed to the location.
Some of the examples for these type of signs are route markers, destination signs, mile posts, service in-formation, recreational and cultural interest area signing etc. Route markers are used to identify numbered highways. They have designs that are distinctive and unique. They are written black letters on yellow back-ground. Destination signs are used to indicate the direction to the critical destination points, and to mark important intersections. Distance in kilometers are sometimes marked to the right side of the destination. They are, in general, rectangular with the long dimension in the horizontal direction. They are color coded as white letters with green background.
Mile posts are provided to inform the driver about the progress along a route to reach his destination.
50
Classification of road markings
The road markings are de ned as lines, patterns, words or other devices, except signs, set into applied or attached to the carriageway or kerbs or to objects within or adjacent to the carriageway, for controlling, warning, guiding and informing the users. The road markings are classi ed as longitudinal markings, transverse markings, object markings, word messages, marking for parkings, marking at hazardous locations etc.
Longitudinal markings
Longitudinal markings are placed along the direction of tra c on the roadway surface, for the purpose of indicating to the driver, his proper position on the roadway. Some of the guiding principles in longitudinal markings are also discussed below.
Longitudinal markings are provided for separating tra c ow in the same direction and the predominant color used is white. Yellow color is used to separate the tra c ow in opposite direction and also to separate the pavement edges. The lines can be either broken, solid or double solid. Broken lines are permissive in character and allows crossing with discretion, if tra c situation permits. Solid lines are restrictive in character and does not allow crossing except for entry or exit from a side road or premises or to avoid a stationary obstruction. Double solid lines indicate severity in restrictions and should not be crossed except in case of emergency. There can also be a combination of solid and broken lines. In such a case, a solid line may be crossed with discretion, if the broken line of the combination is nearer to the direction of travel. Vehicles from the opposite directions are not permitted to cross the line. Di erent types of longitudinal markings are centre line, tra c lanes, no passing zone, warning lines, border or edge lines, bus lane markings, cycle lane markings.
150
3 m 4.5 m
Figure 37:1: Centre line marking for a two lane road
1.5m 3m
3m 4.5 m
Figure 37:2: Centre line and lane marking for a four lane road
Centre line
Centre line separates the opposing streams of tra c and facilitates their movements. Usually no centre line is provided for roads having width less than 5 m and for roads having more than four lanes. The centre line may be marked with either single broken line, single solid line, double broken line, or double solid line depending upon the road and tra c requirements. On urban roads with less than four lanes, the centre line
51
may be single broken line segments of 3 m long and 150 mm wide. The broken lines are placed with 4.5 m gaps ( gure 37:1). On curves and near intersections, gap shall be reduced to 3 metres. On undivided urban roads with at least two tra c lanes in each direction, the centre line marking may be a single solid line of 150 mm wide as in gure 37:2, or double solid line of 100 mm wide separated by a space of 100 mm as shown in gure 37:3. The centre barrier line marking for four lane road is shown in gure 37:4.
1.5m 3m
100
Figure 37:3: Double solid line for a two lane road
100 mm
1.5m 3m
150 mm
Figure 37:4: Centre barrier line marking for four lane road
100
1.5m 3.0 m
150
Figure 37:5: Lane marking for a four lane road with solid barrier line
Traffic lane lines
The subdivision of wide carriageways into separate lanes on either side of the carriage way helps the driver to go straight and also curbs the meandering tendency of the driver. At intersections, these tra c lane lines will eliminate confusion and facilitates turning movements. Thus traffic lane markings help in increasing the capacity of the road in addition ensuring more safety. The traffic lane lines are normally single broken lines of 100 mm width. Some examples are shown in figure 37:5 and figure 37:6.
No passing zones
No passing zones are established on summit curves, horizontal curves, and on two lane and three lane highways
52
where overtaking maneuvers are prohibited because of low sight distance. It may be marked by a solid yellow line along the centre or a double yellow line. In the case of a double yellow line, the left hand element may be a solid barrier line, the right hand may be a either a broken line or a solid line . These solid lines are also called barrier lines. When a solid line is to the right of the broken line, the passing restriction shall apply only to the
100
150
1.5 m
3.0 m
3.0 m
4.5 m
Figure 37:6: Traffic lane marking for a four lane road with broken centre line
53
yellow single/double line
Figure 37:7: Barrier line marking for a four lane road
Barrier
line
Figure 37:8: No passing zone marking at horizontal curves
opposing tra c. Some typical examples are shown in gure 37:7 and gure 37:8. In the latter case, the no passing zone is staggered for each direction.
Warning lines
Warning lines warn the drivers about the obstruction approaches. They are marked on horizontal and vertical curves where the visibility is greater than prohibitory criteria speci ed for no overtaking zones. They are broken lines with 6 m length and 3 m gap. A minimum of seven line segments should be provided. A typical example is shown in gure 37:9
Edge lines
Edge lines indicate edges of rural roads which have no kerbs to delineate the limits upto which the driver can safely venture. They should be at least 150 mm from the actual edge of the pavement. They are painted in yellow or white.
54
3m 6m
Figure 37:9: Warning line marking for a two lane road
300
200
STOP
150
Figure 37:10: Stop line marking near an intersection
All the lines should be preferably light re ective, so that they will be visible during night also. Improved night visibility may also be obtained by the use of minute glass beads embedded in the pavement marking materials to produce a retrore ective surface.
Transverse markings
Transverse markings are marked across the direction of tra c. They are marked at intersections etc. The site conditions play a very important role. The type of road marking for a particular intersection depends on several variables such as speed characteristics of tra c, availability of space etc. Stop line markings, markings for pedestrian crossing, direction arrows, etc. are some of the markings on approaches to intersections.
Stop line
Stop line indicates the position beyond which the vehicles should not proceed when required to stop by control devices like signals or by tra c police. They should be placed either parallel to the intersecting roadway or at right angles to the direction of approaching vehicles. An example for a stop line marking is shown in gure 37:10.
55
Figure 37:11: Pedestrian marking near an intersection
Pedestrian crossings
Pedestrian crossings are provided at places where the con ict between vehicular and pedestrian tra c is severe. The site should be selected that there is less inconvenience to the pedestrians and also the vehicles are not interrupted too much. At intersections, the pedestrian crossings should be preceded by a stop line at a distance of 2 to 3m for unsignalized intersections and at a distance of one metre for signalized intersections. Most commonly used pattern for pedestrian crossing is Zebra crossing consisting of equally spaced white strips of 500 mm wide. A typical example of an intersection illustrating pedestrian crossings is shown in gure 37:11.
Directional arrows
In addition to the warning lines on approaching lanes, directional arrows should be used to guide the drivers in advance over the correct lane to be taken while approaching busy intersections. Because of the low angle at which the markings are viewed by the drivers, the arrows should be elongated in the direction of tra c for adequate visibility. The dimensions of these arrows are also very important. A typical example of a directional arrow is shown in gure 37:12.
Object marking
Physical obstructions in a carriageway like tra c island or obstructions near carriageway like signal posts, pier etc. cause serious hazard to the ow of tra c and should be adequately marked. They may be marked on the objects adjacent to the carriageway.
Objects within the carriageway
The obstructions within the carriageway such as tra c islands, raised medians, etc. may be marked by not less than ve alternate black and yellow stripes. The stripes should slope forward at an angle of 45 with respect to
56
3.5m
1.2 m
1.2 m
0.5m
.0
3.5m
55
m
4m.0
1
0.2m
.
25m
0.4m
0.3m
0.3m
Figure 37:12: Directional arrow marking
the direction of tra c. These stripes shall be uniform and should not be less than 100 m wide so as to provide su cient visibility.
Objects adjacent to carriageway
Sometimes objects adjacent to the carriageway may pose some obstructions to the ow of tra c. Objects such as subway piers and abutments, culvert head walls etc. are some examples for such obstructions. They should be marked with alternate black and white stripes at a forward angle of 45 with respect to the direction of tra c. Poles close to the carriageway should be painted in alternate black and white up to a height of 1.25 m above the road level. Other objects such as guard stones, drums, guard rails etc. where chances of vehicles hitting them are only when vehicle runs o the carriageway should be painted in solid white. Kerbs of all islands located in the line of tra c ow shall be painted with either alternating black and white stripes of 500 mm wide or chequered black and white stripes of same width. The object marking for central pier and side walls of an underpass is illustrated in gure 37:13.
Word messages
Information to guide, regulate, or warn the road user may also be conveyed by inscription of word message on road surface. Characters for word messages are usually capital letters. The legends should be as brief as possible and shall not consist of more than three words for any message. Word messages require more and important time to read and comprehend than other road markings. Therefore, only few and important ones are usually adopted. Some of the examples of word messages are STOP, SLOW, SCHOOL, RIGHT TUN ONLY etc. The character of a road message is also elongated so that driver looking at the road surface at a low angle can also read them easily. The dimensioning of a typical alphabet is shown in gure 37:14.
57
Figure 37:13: Marking for objects adjacent to the road way
313 260 1250
78
Figure 37:14: Typical dimension of the character T used in road marking
58
L
L
L
Figure 37:15: Approach marking for obstructions on the road way
Parking
The marking of the parking space limits on urban roads promotes more e cient use of the parking spaces and tends to prevent encroachment on places like bus stops, re hydrant zones etc. where parking is undesirable. Such parking space limitations should be indicated with markings that are solid white lines 100 mm wide. Words TAXI, CARS, SCOOTERS etc. may also be written if the parking area is speci c for any particular type of vehicle. To indicate parking restriction, kerb or carriage way marking of continuous yellow line 100 mm wide covering the top of kerb or carriageway close to it may be used.
Hazardous location
Wherever there is a change in the width of the road, or any hazardous location in the road, the driver should be warned about this situation with the help of suitable road markings. Road markings showing the width transition in the carriageway should be of 100 mm width. Converging lines shall be 150 mm wide and shall have a taper length of not less than twenty times the o -set distance. Typical carriageway markings showing transition from wider to narrower sections and vice-versa is shown in gure 37:15. In the gure, the driver is warned about the position of the pier through proper road markings.
Parking
Parking is one of the major problems that is created by the increasing road tra c. It is an impact of transport development. The availability of less space in urban areas has increased the demand for parking space especially in areas like Central business district. This a ects the mode choice also. This has a great economical impact.
Parking studies
Before taking any measures for the betterment of conditions, data regarding availability of parking space, extent of its usage and parking demand is essential. It is also required to estimate the parking fares also. Parking surveys are intended to provide all these information. Since the duration of parking varies with di erent vehicles, several statistics are used to access the parking need.
Parking statistics
Parking accumulation: It is de ned as the number of vehicles parked at a given instant of time. Normally this is expressed by accumulation curve. Accumulation curve is the graph obtained by plotting the number of bays occupied with respect to time.
Parking volume: Parking volume is the total number of vehicles parked at a given duration of time. This does not account for repetition of vehicles. The actual volume of vehicles entered in the area is recorded.
59
Parking load : Parking load gives the area under the accumulation curve. It can also be obtained by simply multiplying the number of vehicles occupying the parking area at each time interval with the time interval. It is expressed as vehicle hours.
Average parking duration: It is the ratio of total vehicle hours to the number of vehicles parked.
parkingduration = parkingload
parkingvolume
Parking turnover: It is the ratio of number of vehicles parked in a duration to the number of parking bays available.
parkingturnover =
parkingvolume
N o:of baysavailable
This can be expressed as number of vehicles per bay per time duration.
60
Parking index: Parking index is also called occupancy or e ciency. It is de ned as the ratio of number of bays occupied in a time duration to the total space available. It gives an aggregate measure of how e ectively the parking space is utilized. Parking index can be found out as follows
parking index =
parking load
parking capacity 100
(38.1)
To illustrate the various measures, consider a small example in gure 38:1, which shows the duration for which each of the bays are occupied(shaded portion). Now the accumulation graph can be plotted by simply noting the number of bays occupied at time interval of 15, 30, 45 etc. minutes ias shown in the gure.
No. of vehicles
1
____
__
2
_______________
3
________
________
Bays and occupancy
3
2
1
0
15
30
45
60
75
90
105
110
Time
Parking accumulation curve
Figure 38:1: Parking bays and accumulation curve
The various measures are calculated as shown below:
Parking volume= 5 vehicles.
Parking load = (1 + 2 + 1 + 0 + 1 + 2 + 3 + 1) 15 = 11 15 = 2.75 veh hour.
60 60
Average parking duration = 2:75 veh hours = 33 minutes.
5veh
Parking turnover = 5 veh=2 hours = 0.83 veh/hr/bay.
3bays
Parking index = 2:75 veh hour 100= 45.83%
3 2 veh hours
Parking surveys
Parking surveys are conducted to collect the above said parking statistics. The most common parking surveys conducted are in-out survey, xed period sampling and license plate method of survey.
2.2.5 In-out survey: In this survey, the occupancy count in the selected parking lot is taken at the beginning. Then the number of vehicles that enter the parking lot for a particular time interval is counted. The number of vehicles that leave the parking lot is also taken. The nal occupancy in the parking lot is also taken. Here the labor required is very less. Only one person may be enough. But we wont get any data regarding the time duration for which a particular vehicle used that parking lot. Parking duration and turn over is not obtained. Hence we cannot estimate the parking fare from this survey.
2.2.6 Fixed period sampling: This is almost similar to in-out survey. All vehicles are counted at the beginning of the survey. Then after a xed time interval that may vary between 15 minutes to i hour, the count is again taken. Here there are chances of missing the number of vehicles that were parked for a short duration.
61
2.2.7 License plate method of survey: This results in the most accurate and realistic data. In this case of survey, every parking stall is monitored at a continuous interval of 15 minutes or so and the license plate number is noted down. This will give the data regarding the duration for which a particular vehicle was using the parking bay. This will help in calculating the fare because fare is estimated based on the duration for which the vehicle was parked. If the time interval is shorter, then there are less chances of missing short-term parkers. But this method is very labor intensive.
Ill effects of parking
Parking has some ill-effects like congestion, accidents, pollution, obstruction to re- lighting operations etc.
Congestion: Parking takes considerable street space leading to the lowering of the road capacity. Hence, speed will be reduced, journey time and delay will also subsequently increase. The operational cost of the vehicle increases leading to great economical loss to the community.
Accidents: Careless maneuvering of parking and unparking leads to accidents which are referred to as parking accidents. Common type of parking accidents occur while driving out a car from the parking area, careless opening of the doors of parked cars, and while bringing in the vehicle to the parking lot for parking.
Environmental pollution: They also cause pollution to the environment because stopping and starting of vehicles while parking and unparking results in noise and fumes. They also a ect the aesthetic beauty of the buildings because cars parked at every available space creates a feeling that building rises from a plinth of cars.
Obstruction to relighting operations: Parked vehicles may obstruct the movement of relighting vehicles. Sometimes they block access to hydrants and access to buildings.
Parking requirements
There are some minimum parking requirements for di erent types of building. For residential plot area less than 300 sq.m require only community parking space. For residential plot area from 500 to 1000 sq.m, minimum one-fourth of the open area should be reserved for parking. O ces may require atleast one space for every 70 sq.m as parking area. One parking space is enough for 10 seats in a restaurant where as theatres and cinema halls need to keep only 1 parking space for 20 seats. Thus, the parking requirements are di erent for di erent land use zones.
On street parking
On street parking means the vehicles are parked on the sides of the street itself. This will be usually controlled by government agencies itself. Common types of on-street parking are as listed below. This classi cation is based on the angle in which the vehicles are parked with respect to the road alignment. As per IRC the standard dimensions of a car is taken as 5 2.5 metres and that for a truck is 3.75 7.5 metres.
62
L
5.9
2.5
5.0
Figure 38:2: Illustration of parallel parking
1.254.33
A B
C D
30
O1Q
2
5
m
P
L
1.25 m
E
....
n
4.66 m
5
m
.
2
Figure 38:3: Illustration of 30 parking
Parallel parking: The vehicles are parked along the length of the road. Here there is no backward movement involved while parking or unparking the vehicle. Hence, it is the most safest parking from the accident perspective. However, it consumes the maximum curb length and therefore only a minimum number of vehicles can be parked for a given kerb length. This method of parking produces least obstruc-tion to the on-going tra c on the road since least road width is used. Parallel parking of cars is shown in
gure 38:2. The length available to park N number of vehicles, L =
30 parking: In thirty degree parking, the vehicles are parked at 30 with respect to the road alignment. In this case, more vehicles can be parked compared to parallel parking. Also there is better maneuver-ability. Delay caused to the tra c is also minimum in this type of parking. An example is shown in gure 38:3. From the gure,
AB
= OBsin30 =
1:25;
BC
= OP cos30 =
4:33;
BD
= DQcos60 =
5;
CD = BDBC = 5 4:33 = 0:67;
AB + BC
= 1:25 + 4:33 =
5:58
For N vehicles, L = AC + (N-1)CE =5.58+(N-1)5 =0.58+5N
45 parking: As the angle of parking increases, more number of vehicles can be parked. Hence compared to parallel parking and thirty degree parking, more number of vehicles can be accommodated in this type of parking. From gure 38:4, length of parking space available for parking N number of vehicles in a given kerb is L = 3.54 N+1.77
60 parking: The vehicles are parked at 60 to the direction of road. More number of vehicles can be accommodated in this parking type. From the gure 38:5, length available for parking N vehicles =2.89N+2.16.
N
5:9
63
45
5 . 0
m
1.77
5.31 m
.5
m
2
Figure 38:4: Illustration of 45 parking
L
60
2.5m
Figure 38:5: Illustration of 60 parking
Right angle parking: In right angle parking or 90 parking, the vehicles are parked perpendicular to the direction of the road. Although it consumes maximum width kerb length required is very little. In this type of parking, the vehicles need complex maneuvering and this may cause severe accidents. This arrangement causes obstruction to the road tra c particularly if the road width is less. However, it can accommodate maximum number of vehicles for a given kerb length. An example is shown in gure 38:6. Length available for parking N number of vehicles is L = 2.5N.
offstreet parking
In many urban centres, some areas are exclusively allotted for parking which will be at some distance away from the main stream of tra c. Such a parking is referred to as o -street parking. They may be operated by either public agencies or private rms. A typical layout of an o -street parking is shown in gure 38:7.
L
2.5
Figure 38:6: Illustration of 90 parking
64
__ _
___
___
______
__ _
___
___
______
__ _
___
___
______
__ _
______
ENTRY
________________________
________________________
______________
__________
________________________
________________________
________________________
________________________
________________________
_ _ _ _ _ _ _ _ _ _ _ _
EXIT
______
___
___
______
_______
______
_______
___
___
______
_______
___
___
______
Figure 38:7: Illustration off-street parking
Example 1
From an in-out survey conducted for a parking area consisting of 40 bays, the initial count was found to be 25. Table gives the result of the survey. The number of vehicles coming in and out of the parking lot for a time interval of 5 minutes is as shown in the table 38:1. Find the accumulation, total parking load, average occupancy and e ciency of the parking lot.
Table 38:1: In-out survey data
Time
In
Out
5
3
2
10
2
4
15
4
2
20
5
4
25
7
3
30
8
2
35
2
7
40
4
2
45
6
4
50
4
1
55
3
3
60
2
5
Solution The solution is shown in table 38:2
Accumulation can be found out as initial count plus number of vehicles that entered the parking lot till that time minus the number of vehicles that just exited for that particular time interval. For the rst time interval of 5 minutes, accumulation can be found out as 25+3-2 = 26. It is being tabulated in column 4.
Occupancy or parking index is given by equation For the rst time interval of ve minutes, P arking index =
65
Table 38:2: In-out parking survey solution
Time
In
Out
Accumulation
Occupancy
Parking load
(1)
(2)
(3)
(4)
(5)
(6)
5
3
2
26
65
130
10
2
4
24
60
120
15
4
2
26
65
130
20
5
4
27
67.5
135
25
7
3
31
77.5
155
30
8
2
37
92.5
185
35
2
7
32
80
160
40
4
2
34
85
170
45
6
4
36
90
180
50
4
1
39
97.5
195
55
3
3
39
97.5
195
60
2
5
36
90
180
Total
1735
2640 100 = 65%. The occupancy for the remaining time slot is similarly calculated and is tabulated in column 5.
Average occupancy is the average of the occupancy values for each time interval. Thus it is the average of all values given in column 5 and the value is 80.63%.
Parking load is tabulated in column 6. It is obtained by multiplying accumulation with the time interval. For the rst time interval, parking load = 26 5 = 130 vehicle minutes.
Total parking load is the summation of all the values in column 5 which is equal to 1935 vehicle minutes or 32.25 vehicle hours
Example 2
The parking survey data collected from a parking lot by license plate method is s shown in the table 38:3 below. Find the average occupancy, average turn over, parking load, parking capacity and e ciency of the parking lot.
Solution See the following table for solution 38:4. Columns 1 to 5 is the input data. The parking status in every bay is coded rst. If a vehicle occupies that bay for that time interval, then it has a code 1. This is shown in columns 6, 7, 8 and 9 of the table corresponding to the time intervals 15, 30, 45 and 60 seconds.
Turn over is computed as the number of vehicles present in that bay for that particular hour. For the rst bay, it is counted as 3. Similarly, for the second bay, one vehicle is present throughout that hour
and hence turnout is 1 itself. This is being tabulated in column 10 of the table. Average turn over =
Sum of turn over
= 2.25
Total number of bays
66
Table 38:3: Licence plate parking survey data
Bay
Time
0-15
15-30
30-45
45-60
1
1456
9813
-
5678
2
1945
1945
1945
1945
3
3473
5463
5463
5463
4
3741
3741
9758
4825
5
1884
1884
-
7594
6
-
7357
-
7893
7
-
4895
4895
4895
8
8932
8932
8932
-
9
7653
7653
8998
4821
10
7321
-
2789
2789
11
1213
1213
3212
4778
12
5678
6678
7778
8888
Accumulation for a time interval is the total of number of vehicles in the bays 1 to 12 for that time interval. Accumulation for rst time interval of 15 minutes = 1+1+1+1+1+0+0+1+1+1+1+1 = 10
Parking volume = Sum of the turn over in all the bays = 27 vehicles
Average duration is the average time for which the parking lot was used by the vehicles. It can be calculated as sum of the accumulation for each time interval time interval divided by the parking
volume = (10+11+9+11) 15 = 22.78 minutes/vehicle.
27
Occupancy for that time interval is accumulation in that particular interval divided by total number of bays. For rst time interval of 15 minutes, occupancy = (10 100)/12 = 83% Average occupancy is found out as the average of total number of vehicles occupying the bay for each time interval. It is expressed in
percentage. Average occupancy =
0:83+0:92+0:75+0:92
100 = 85.42%.
4
Parking capacity = number of bays number of hours = 12 1 = 12 vehicle hours
(10+11+9+11) 15
Parking load = total number of vehicles accumulated at the end of each time interval time = 60 = 10.25 vehicle hours
Effciency =
Parking load
=
10:25
= 85.42%.
Total number of bays
67
CHAPTER 4
INTERSETION DESIGNS
Overview
Rotary intersections or round abouts are special form of at-grade intersections laid out for the movement of tra c in one direction around a central tra c island. Essentially all the major con icts at an intersection namely the collision between through and right-turn movements are converted into milder con icts namely merging and diverging. The vehicles entering the rotary are gently forced to move in a clockwise direction in orderly fashion. They then weave out of the rotary to the desired direction. The bene ts, design principles, capacity of rotary etc. will be discussed in this chapter.
Advantages and disadvantages of rotary
The key advantages of a rotary intersection are listed below:
12.2.6 Tra c ow is regulated to only one direction of movement, thus eliminating severe con icts between crossing movements.
12.2.7 All the vehicles entering the rotary are gently forced to reduce the speed and continue to move at slower speed. Thus, none of the vehicles need to be stopped,unlike in a signalized intersection.
12.2.8 Because of lower speed of negotiation and elimination of severe con icts, accidents and their severity are much less in rotaries.
12.2.9 Rotaries are self governing and do not need practically any control by police or trafficsignals.
12.2.10 They are ideally suited for moderate tra c, especially with irregular geometry, or intersections with more than three or four approaches.
Although rotaries o er some distinct advantages, there are few speci c limitations for rotaries which are listed below.
All the vehicles are forced to slow down and negotiate the intersection. Therefore, the cumulative delay will be much higher than channelized intersection.
Even when there is relatively low tra c, the vehicles are forced to reduce their speed.
Rotaries require large area of relatively at land making them costly at urban areas.
The vehicles do not usually stop at a rotary. They accelerate and exit the rotary at relatively high speed. Therefore, they are not suitable when there are high pedestrian movements.
68
_ _
___ ___ ___ ___
___
______________ ______________ ______________ ______________ ______________
______ ______________ ______________ ______________ ______________ ______________
______________
______________ ______________
__
__
__
__
__
_ _ _
______
______
Figure 40:1: Trafficoperations in a rotary
Guidelines for the selection of rotaries
Because of the above limitation, rotaries are not suitable for every location. There are few guidelines that help in deciding the suitability of a rotary. They are listed below.
2.2.8 Rotaries are suitable when the trafficentering from all the four approaches are relatively equal.
2.2.9 A total volume of about 3000 vehicles per hour can be considered as the upper limiting case and a volume of 500 vehicles per hour is the lower limit.
2.2.10 A rotary is very bene cial when the proportion of the right-turn tra c is very high; typically if it is more than 30 percent.
2.2.11 Rotaries are suitable when there are more than four approaches or if there is no separate lanes available for right-turn tra c. Rotaries are ideally suited if the intersection geometry is complex.
Traffic operations in a rotary
As noted earlier, the tra c operations at a rotary are three; diverging, merging and weaving. All the other con icts are converted into these three less severe con icts.
2.5 Diverging: It is a tra c operation when the vehicles moving in one direction is separated into di erent streams according to their destinations.
2.6 Merging: Merging is the opposite of diverging. Merging is referred to as the process of joining the tra c coming from di erent approaches and going to a common destination into a single stream.
2.7 Weaving: Weaving is the combined movement of both merging and diverging movements in the same direction.
These movements are shown in gure 40:1. It can be observed that movements from each direction split into three; left, straight, and right turn.
69
exit radius
entry radius
entry width
weaving
length
splitterisland
radius of the central island
weaving width
circulation width
exit width
radius of the inscribed circle
approach width
GIVE WAY line
Figure 40:2: Design of a rotary
Design elements
The design elements include design speed, radius at entry, exit and the central island, weaving length and width, entry and exit widths. In addition the capacity of the rotary can also be determined by using some empirical formula. A typical rotary and the important design elements are shown in gure 40:2
Design speed
All the vehicles are required to reduce their speed at a rotary. Therefore, the design speed of a rotary will be much lower than the roads leading to it. Although it is possible to design roundabout without much speed reduction, the geometry may lead to very large size incurring huge cost of construction. The normal practice is to keep the design speed as 30 and 40 kmph for urban and rural areas respectively.
Entry, exit and island radius
The radius at the entry depends on various factors like design speed, super-elevation, and coe cient of friction. The entry to the rotary is not straight, but a small curvature is introduced. This will force the driver to reduce the speed. The entry radius of about 20 and 25 metres is ideal for an urban and rural design respectively.
The exit radius should be higher than the entry radius and the radius of the rotary island so that the vehicles will discharge from the rotary at a higher rate. A general practice is to keep the exit radius as 1.5 to 2 times the entry radius. However, if pedestrian movement is higher at the exit approach, then the exit radius could be set as same as that of the entry radius.
The radius of the central island is governed by the design speed, and the radius of the entry curve. The radius of the central island, in practice, is given a slightly higher radius so that the movement of the tra c already in the rotary will have priority. The radius of the central island which is about 1.3 times that of the entry curve is adequate for all practical purposes.
70
d
d
b
c
c
b
a
a
Figure 40:3: Weaving operation in a rotary
Width of the rotary
The entry width and exit width of the rotary is governed by the tra c entering and leaving the intersection and the width of the approaching road. The width of the carriageway at entry and exit will be lower than the width of the carriageway at the approaches to enable reduction of speed. IRC suggests that a two lane road of 7 m width should be kept as 7 m for urban roads and 6.5 m for rural roads. Further, a three lane road of 10.5 m is to be reduced to 7 m and 7.5 m respectively for urban and rural roads.
The width of the weaving section should be higher than the width at entry and exit. Normally this will be one lane more than the average entry and exit width. Thus weaving width is given as,
wweaving =
e1
+ e
2
+ 3:5m
(40.1)
2
where e1 is the width of the carriageway at the entry and e2
is the carriageway width at exit.
Weaving length determines how smoothly the tra c can merge and diverge. It is decided based on many factors such as weaving width, proportion of weaving tra c to the non-weaving tra c etc. This can be best achieved by making the ratio of weaving length to the weaving width very high. A ratio of 4 is the minimum value suggested by IRC. Very large weaving length is also dangerous, as it may encourage over-speeding.
Capacity
The capacity of rotary is determined by the capacity of each weaving section. Transportation road research lab (TRL) proposed the following empirical formula to nd the capacity of the weaving section.
280w[1 +
e
][1 p
]
w
Qw =
3
(40.2)
1 + w
l
where e is the average entry and exit width, i.e, (e1 +e2 ) , w is the weaving width, l is the length of weaving, and
2
p is the proportion of weaving tra c to the non-weaving tra c. Figure 40:3 shows four types of movements at a weaving section, a and d are the non-weaving tra c and b and c are the weaving tra c. Therefore,
b + c
(40.3)
p = a + b + c + d
This capacity formula is valid only if the following conditions are satis ed. 1. Weaving width at the rotary is in between 6 and 18 metres.
71
N
1433
400
375
408
600
W 1405
505
650
1260
500
E
510
420
350
250
370
1140
S
Figure 40:4: Trafficapproaching the rotary
37.5.1 The ratio of average width of the carriage way at entry and exit to the weaving width is in the range of 0.4 to 1.
37.5.2 The ratio of weaving width to weaving length of the roundabout is in between 0.12 and 0.4.
37.5.3 The proportion of weaving trafficto non-weaving trafficin the rotary is in the range of 0.4 and 1.
37.5.4 The weaving length available at the intersection is in between 18 and 90 m.
Example
The width of a carriage way approaching an intersection is given as 15 m. The entry and exit width at the rotary is 10 m. The tra c approaching the intersection from the four sides is shown in the gure 40:4 below. Find the capacity of the rotary using the given data.
Solution
The traffic from the four approaches negotiating through the roundabout is illustrated in gure 40:5.
Weaving width is calculated as, w = [ e1 +e2
] + 3:5 = 13.5 m
2
Weaving length, l is calculated as = 4 w = 54 m
The proportion of weaving traffic to the non-weaving trafficin all the four approaches is found out rst.
It is clear from equation,that the highest proportion of weaving trafficto non-weaving trafficwill give
the minimum capacity. Let the proportion of weaving tra c to the non-weaving tra c in West-North direction be denoted as pW N , in North-East direction as pN E , in the East-South direction as pES , and nally in the South-West direction as pSW .
The weaving trafficmovements in the East-South direction is shown in gure 40:6. Then using equation,pES
The trafficfrom the four approaches negotiating through the roundabout is illustrated in gure 40:7.
Weaving width is calculated as, w = [ e1 +e2
] + 3:5 = 13.5 m
2
Weaving length can be calculated as, l = 4 w = 54 m
The proportion of weaving trafficto the non-weaving trafficin all the four approaches is found out rst.
It is clear from equation,that the highest proportion of weaving tra c to non-weaving tra c will give the minimum capacity. Let the proportion of weaving tra c to the non-weaving tra c in West-North direc-
tion be denoted as pW N , in North-East direction as pN E , in the East-South direction as pES , and nally
in the South-West direction as pSW . Then using equation,pES =
450+550+700+520
= 2220
=0.816
200+450+550+700+520+300
2720
pW N
=
370+550+500+520
= 1740 =0.69
350+370+550+500+520+420
2510
pN E
=
420+500+700+300
= 1920
=0.676
520+400+420+500+700+300
2840
pSW
=
450+300+370+420
= 1540
=0.630
550+450+400+370+420+350
2540
74
CHAPTER 5
HIGHWAY MATERIAL, CONSTRUCTION AND MAINTENANCE
Overview
A highway pavement is a structure consisting of superimposed layers of processed materials above the natural soil sub-grade, whose primary function is to distribute the applied vehicle loads to the sub-grade. The pavement structure should be able to provide a surface of acceptable riding quality, adequate skid resistance, favorable light re ecting characteristics, and low noise pollution. The ultimate aim is to ensure that the transmitted stresses due to wheel load are su ciently reduced, so that they will not exceed bearing capacity of the sub-grade. Two types of pavements are generally recognized as serving this purpose, namely exible pavements and rigid pavements. This chapter gives an overview of pavement types, layers, and their functions, and pavement failures. Improper design of pavements leads to early failure of pavements a ecting the riding quality.
Requirements of a pavement
An ideal pavement should meet the following requirements:
Su cient thickness to distribute the wheel load stresses to a safe value on the sub-grade soil, Structurally strong to withstand all types of stresses imposed upon it,
Adequate coe cient of friction to prevent skidding of vehicles,
Smooth surface to provide comfort to road users even at high speed, Produce least noise from moving vehicles,
Dust proof surface so that tra c safety is not impaired by reducing visibility, Impervious surface, so that sub-grade soil is well protected, and
Long design life with low maintenance cost.
Types of pavements
The pavements can be classi ed based on the structural performance into two, exible pavements and rigid pavements. In exible pavements, wheel loads are transferred by grain-to-grain contact of the aggregate through the granular structure. The exible pavement, having less exural strength, acts like a exible sheet (e.g.
Wheel Load P
______________ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _
Granular _______________ _ _ _ _ _ _
Structure _______________ _ _ _ _ _ _ _______________ _ _ _ _ _ _
75
Figure 19:1: Load transfer in granular structure
bituminous road). On the contrary, in rigid pavements, wheel loads are transferred to sub-grade soil by exural strength of the pavement and the pavement acts like a rigid plate (e.g. cement concrete roads). In addition to these, composite pavements are also available. A thin layer of exible pavement over rigid pavement is an ideal pavement with most desirable characteristics. However, such pavements are rarely used in new construction because of high cost and complex analysis required.
Flexible pavements
Flexible pavements will transmit wheel load stresses to the lower layers by grain-to-grain transfer through the points of contact in the granular structure (see Figure 19:1). The wheel load acting on the pavement will be distributed to a wider area, and the stress decreases with the depth. Taking advantage of this stress distribution characteristic, exible pavements normally has many layers. Hence, the design of exible pavement uses the concept of layered system. Based on this, exible pavement may be constructed in a number of layers and the top layer has to be of best quality to sustain maximum compressive stress, in addition to wear and tear. The lower layers will experience lesser magnitude of stress and low quality material can be used. Flexible pavements are constructed using bituminous materials. These can be either in the form of surface treatments (such as bituminous surface treatments generally found on low volume roads) or, asphalt concrete surface courses (generally used on high volume roads such as national highways). Flexible pavement layers re ect the deformation of the lower layers on to the surface layer (e.g., if there is any undulation in sub-grade then it will be transferred to the surface layer). In the case of exible pavement, the design is based on overall performance of exible pavement, and the stresses produced should be kept well below the allowable stresses of each pavement layer.
76
Tack Coat
Seal Coat
Prime coat
Surface Course (25−50 mm)
Binder Course (50−100 mm)
Base Course (100−300 mm)
Subbase Course (100−300 mm)
Compacted Subgrade (150−300 mm)
Natural Subgrade
Figure 19:2: Typical cross section of a flexible pavement
2.2.12 Types of Flexible Pavements
The following types of construction have been used in flexible pavement:
Conventional layered flexible pavement, Full - depth asphalt pavement, and
Contained rock asphalt mat (CRAM).
Conventional flexible pavements are layered systems with high quality expensive materials are placed in the top where stresses are high, and low quality cheap materials are placed in lower layers.
Full - depth asphalt pavements are constructed by placing bituminous layers directly on the soil sub-grade. This is more suitable when there is high traffic and local materials are not available.
Contained rock asphalt mats are constructed by placing dense/open graded aggregate layers in between two asphalt layers. Modified dense graded asphalt concrete is placed above the sub-grade will signi cantly reduce the vertical compressive strain on soil sub-grade and protect from surface water.
Typical layers of a flexible pavement
Typical layers of a conventional exible pavement includes seal coat, surface course, tack coat, binder course, prime coat, base course, sub-base course, compacted sub-grade, and natural sub-grade (Figure 19:2).
Seal Coat: Seal coat is a thin surface treatment used to water-proof the surface and to provide skid resistance.
Tack Coat: Tack coat is a very light application of asphalt, usually asphalt emulsion diluted with water. It provides proper bonding between two layer of binder course and must be thin, uniformly cover the entire surface, and set very fast.
Prime Coat: Prime coat is an application of low viscous cutback bitumen to an absorbent surface like granular bases on which binder layer is placed. It provides bonding between two layers. Unlike tack coat, prime coat penetrates into the layer below, plugs the voids, and forms a water tight surface.
Surface course
Surface course is the layer directly in contact with tra c loads and generally contains superior quality materials. They are usually constructed with dense graded asphalt concrete(AC). The functions and requirements of this layer are:
77
It provides characteristics such as friction, smoothness, drainage, etc. Also it will prevent the entrance of excessive quantities of surface water into the underlying base, sub-base and sub-grade,
It must be tough to resist the distortion under tra c and provide a smooth and skid- resistant riding surface,
It must be water proof to protect the entire base and sub-grade from the weakening e ect of water.
Binder course
This layer provides the bulk of the asphalt concrete structure. It's chief purpose is to distribute load to the base course The binder course generally consists of aggregates having less asphalt and doesn't require quality as high as the surface course, so replacing a part of the surface course by the binder course results in more economical design.
Base course
The base course is the layer of material immediately beneath the surface of binder course and it provides additional load distribution and contributes to the sub-surface drainage It may be composed of crushed stone, crushed slag, and other untreated or stabilized materials.
Sub-Base course
The sub-base course is the layer of material beneath the base course and the primary functions are to provide structural support, improve drainage, and reduce the intrusion of nes from the sub-grade in the pavement structure If the base course is open graded, then the sub-base course with more nes can serve as a ller between sub-grade and the base course A sub-base course is not always needed or used. For example, a pavement constructed over a high quality, sti sub-grade may not need the additional features o ered by a sub-base course. In such situations, sub-base course may not be provided.
Sub-grade
The top soil or sub-grade is a layer of natural soil prepared to receive the stresses from the layers above. It is essential that at no time soil sub-grade is overstressed. It should be compacted to the desirable density, near the optimum moisture content.
Failure of flexible pavements
The major exible pavement failures are fatigue cracking, rutting, and thermal cracking. The fatigue cracking of exible pavement is due to horizontal tensile strain at the bottom of the asphaltic concrete. The failure criterion relates allowable number of load repetitions to tensile strain and this relation can be determined in the laboratory fatigue test on asphaltic concrete specimens. Rutting occurs only on exible pavements as indicated by permanent deformation or rut depth along wheel load path. Two design methods have been used to control rutting: one to limit the vertical compressive strain on the top of subgrade and other to limit rutting to a tolerable amount (12 mm normally). Thermal cracking includes both low-temperature cracking and thermal fatigue cracking.
78
Portland Cement Concrete
Base or Subbase Course
150 − 300 MM
100 − 300 MM
Figure 19:3: Typical Cross section of Rigid pavement
Elastic plate
Viscous foundation Contact Pressure
Figure 19:4: Elastic plate resting on Viscous foundation
Rigid pavements
Rigid pavements have sufficient flexural strength to transmit the wheel load stresses to a wider area below. A typical cross section of the rigid pavement is shown in Figure 19:3. Compared to exible pavement, rigid pavements are placed either directly on the prepared sub-grade or on a single layer of granular or stabilized material. Since there is only one layer of material between the concrete and the sub-grade, this layer can be called as base or sub-base course.
In rigid pavement, load is distributed by the slab action, and the pavement behaves like an elastic plate resting on a viscous medium (Figure 19:4). Rigid pavements are constructed by Portland cement concrete (PCC) and should be analyzed by plate theory instead of layer theory, assuming an elastic plate resting on viscous foundation. Plate theory is a simplified version of layer theory that assumes the concrete slab as a medium thick plate which is plane before loading and to remain plane after loading. Bending of the slab due to wheel load and temperature variation and the resulting tensile and flexural stress.
Types of Rigid Pavements
Rigid pavements can be classified into four types:
1. Jointed plain concrete pavement (JPCP),
2. Jointed reinforced concrete pavement (JRCP),
3. Continuous reinforced concrete pavement (CRCP), and Pre-stressed concrete pavement (PCP).
Jointed Plain Concrete Pavement: are plain cement concrete pavements constructed with closely spaced contraction joints. Dowel bars or aggregate interlocks are normally used for load transfer across joints. They normally has a joint spacing of 5 to 10m.
Jointed Reinforced Concrete Pavement: Although reinforcements do not improve the structural capacity significantly, they can drastically increase the joint spacing to 10 to 30m. Dowel bars are required for load transfer. Reinforcement’s help to keep the slab together even after cracks.
79
Continuous Reinforced Concrete Pavement: Complete elimination of joints are achieved by reinforce-ment.
Failure criteria of rigid pavements
Traditionally fatigue cracking has been considered as the major, or only criterion for rigid pavement design. The allowable number of load repetitions to cause fatigue cracking depends on the stress ratio between flexural tensile stress and concrete modulus of rupture. Of late, pumping is identified as an important failure criterion. Pumping is the ejection of soil slurry through the joints and cracks of cement concrete pavement, caused during the downward movement of slab under the heavy wheel loads. Other major types of distress in rigid pavements include faulting, spalling, and deterioration.
Bituminous materials or asphalts are extensively used for roadway construction, primarily because of their excellent binding characteristics and water proo ng properties and relatively low cost. Bituminous materials consists of bitumen which is a black or dark coloured solid or viscous cementitious substances consists chie y high molecular weight hydrocarbons derived from distillation of petroleum or natural asphalt, has adhesive properties, and is soluble in carbon disulphide. Tars are residues from the destructive distillation of organic substances such as coal, wood, or petroleum and are temperature sensitive than bitumen. Bitumen will be dissolved in petroleum oils where unlike tar.
Production of Bitumen
bitumen is the residue or by-product when the crude petrolium is re ned. A wide variety of re nery processes, such as the straight distillation process, solvent extraction process etc. may be used to produce bitumen of different consistency and other desirable properties. Depending on the sources and characteristics of the crude oils and on the properties of bitumen required, more than one processing method may be employed.
Vacuum steam distillation of petroleum oils
In the vacuum-steam distillation process the crude oil is heated and is introduced into a large cylindrical still. Steam is introduced into the still to aid in the vaporization of the more volatile constituents of the petroleum and to minimise decomposition of the distillates and residues. The volatile constituents are collected, condensed, and the various fractions stored for further re ning, if needed. The residues from this distillation are then fed into a vacuum distillation unit, where residue pressure and steam will further separate out heavier gas oils. The bottom fraction from this unit is the vacuum-steam-re ned asphalt cement. The consistency of asphalt cement from this process can be controlled by the amount of heavy gas oil removed. Normally, asphalt produced by this process is softer. As the asphalt cools down to room temperature, it becomes a semi solid viscous material.
Different forms of bitumen
Cutback bitumen
Normal practice is to heat bitumen to reduce its viscosity. In some situations preference is given to use liquid binders such as cutback bitumen. In cutback bitumen suitable solvent is used to lower the viscosity of the
80
Bitumen. From the environmental point of view also cutback bitumen is preferred. The solvent from the bituminous material will evaporate and the bitumen will bind the aggregate. Cutback bitumen is used for cold weather bituminous road construction and maintenance. The distillates used for preparation of cutback bitumen are naphtha, kerosene, diesel oil, and furnace oil. There are di erent types of cutback bitumen like rapid curing (RC), medium curing (MC), and slow curing (SC). RC is recommended for surface dressing and patchwork. MC is recommended for premix with less quantity of ne aggregates. SC is used for premix with appreciable quantity of ne aggregates.
Bitumen Emulsion
Bitumen emulsion is a liquid product in which bitumen is suspended in a nely divided condition in an aqueous medium and stabilized by suitable material. Normally cationic type emulsions are used in India. The bitumen content in the emulsion is around 60% and the remaining is water. When the emulsion is applied on the road it breaks down resulting in release of water and the mix starts to set. The time of setting depends upon the grade of bitumen. The viscosity of bituminous emulsions can be measured as per IS: 8887-1995. Three types of bituminous emulsions are available, which are Rapid setting (RS), Medium setting (MS), and Slow setting (SC). Bitumen emulsions are ideal binders for hill road construction. Where heating of bitumen or aggregates are di cult. Rapid setting emulsions are used for surface dressing work. Medium setting emulsions are preferred for premix jobs and patch repairs work. Slow setting emulsions are preferred in rainy season.
Bituminous primers
In bituminous primer the distillate is absorbed by the road surface on which it is spread. The absorption therefore depends on the porosity of the surface. Bitumen primers are useful on the stabilised surfaces and water bound macadam base courses. Bituminous primers are generally prepared on road sites by mixing penetration bitumen with petroleum distillate.
Modified Bitumen
Certain additives or blend of additives called as bitumen modifiers can improve properties of Bitumen and bituminous mixes. Bitumen treated with these modifiers is known as modified bitumen. Polymer modified bitumen (PMB)/ crumb rubber modified bitumen (CRMB) should be used only in wearing course depending upon the requirements of extreme climatic variations. The detailed specifications for modified bitumen have been issued by IRC: SP: 53-1999. It must be noted that the performance of PMB and CRMB is dependent on strict control on temperature during construction. The advantages of using modified bitumen are as follows
Lower susceptibility to daily and seasonal temperature variations Higher resistance to deformation at high pavement temperature Better age resistance properties
Higher fatigue life for mixes
Better adhesion between aggregates and binder Prevention of cracking and reflective cracking
81
Requirements of Bitumen
The desirable properties of bitumen depend on the mix type and construction. In general, Bitumen should posses following desirable properties.
The bitumen should not be highly temperature susceptible: during the hottest weather the mix should not become too soft or unstable, and during cold weather the mix should not become too brittle causing cracks.
The viscosity of the bitumen at the time of mixing and compaction should be adequate. This can be achieved by use of cutbacks or emulsions of suitable grades or by heating the bitumen and aggregates prior to mixing.
There should be adequate a nity and adhesion between the bitumen and aggregates used in the mix.
Tests on bitumen
There are a number of tests to assess the properties of bituminous materials. The following tests are usually conducted to evaluate di erent properties of bituminous materials.
37.5 Penetration test
37.6 Ductility test
37.7 Softening point test
37.8 Speci c gravity test
37.9 Viscosity test
37.10 Flash and Fire point test
37.11 Float test
37.12 Water content test
37.13 Loss on heating test
Penetration test
It measures the hardness or softness of bitumen by measuring the depth in tenths of a millimeter to which a standard loaded needle will penetrate vertically in 5 seconds. BIS had standardised the equipment and test procedure. The penetrometer consists of a needle assembly with a total weight of 100g and a device for releasing and locking in any position. The bitumen is softened to a pouring consistency, stirred thoroughly and poured into containers at a depth at least 15 mm in excess of the expected penetration. The test should be conducted at a speci ed temperature of 25o C. It may be noted that penetration value is largely in uenced by any inaccuracy with regards to pouring temperature, size of the needle, weight placed on the needle and the test temperature. A grade of 40/50 bitumen means the penetration value is in the range 40 to 50 at standard test conditions. In hot climates, a lower penetration grade is preferred. The Figure 23.4.1 shows a schematic Penetration Test setup.
82
Penetration
Figure 23:1: Penetration Test Setup
Ductility test
Ductility is the property of bitumen that permits it to undergo great deformation or elongation. Ductility is de ned as the distance in cm, to which a standard sample or briquette of the material will be elongated without breaking. Dimension of the briquette thus formed is exactly 1 cm square. The bitumen sample is heated and poured in the mould assembly placed on a plate. These samples with moulds are cooled in the air and then in water bath at 27o C temperature. The excess bitumen is cut and the surface is leveled using a hot knife. Then the mould with assembly containing sample is kept in water bath of the ductility machine for about 90 minutes. The sides of the moulds are removed, the clips are hooked on the machine and the machine is operated. The distance up to the point of breaking of thread is the ductility value which is reported in cm. The ductility value gets a ected by factors such as pouring temperature, test temperature, rate of pulling etc. A minimum ductility value of 75 cm has been speci ed by the BIS. Figure 23.4.2 shows ductility moulds to be lled with bitumen.
Ductility
Starting Point
End Point
Figure 23:2: Ductility Test
Softening point test
Softening point denotes the temperature at which the bitumen attains a particular degree of softening under the speci cations of test. The test is conducted by using Ring and Ball apparatus. A brass ring containing test sample of bitumen is suspended in liquid like water or glycerin at a given temperature. A steel ball is placed upon the bitumen sample and the liquid medium is heated at a rate of 5o C per minute. Temperature is noted when the softened bitumen touches the metal plate which is at a speci ed distance below. Generally, higher
83
softening point indicates lower temperature susceptibility and is preferred in hot climates. Figure 23.4.3 shows Softening Point test setup.
Thermometer
Softening
Point
Bitumen
Strarting Point End Point
Figure 23:3: Softening Point Test Setup
Specific gravity test
In paving jobs, to classify a binder, density property is of great use. In most cases bitumen is weighed, but when used with aggregates, the bitumen is converted to volume using density values. The density of bitumen is greatly in uenced by its chemical composition. Increase in aromatic type mineral impurities cause an increase in speci c gravity.
The speci c gravity of bitumen is de ned as the ratio of mass of given volume of bitumen of known content to the mass of equal volume of water at 27o C. The speci c gravity can be measured using either pycnometer or preparing a cube specimen of bitumen in semi solid or solid state. The speci c gravity of bitumen varies from 0.97 to 1.02.
Viscosity test
Viscosity denotes the uid property of bituminous material and it is a measure of resistance to ow. At the application temperature, this characteristic greatly in uences the strength of resulting paving mixes. Low or high viscosity during compaction or mixing has been observed to result in lower stability values. At high viscosity, it resist the compactive e ort and thereby resulting mix is heterogeneous, hence low stability values. And at low viscosity instead of providing a uniform lm over aggregates, it will lubricate the aggregate particles. Ori ce type viscometers are used to indirectly nd the viscosity of liquid binders like cutbacks and emulsions. The viscosity expressed in seconds is the time taken by the 50 ml bitumen material to pass through the ori ce of a cup, under standard test conditions and speci ed temperature. Viscosity of a cutback can be measured with either 4.0 mm ori ce at 25o C or 10 mm ori ce at 25 or 40o C.
Flash and fire point test
At high temperatures depending upon the grades of bitumen materials leave out volatiles. And these volatiles catches re which is very hazardous and therefore it is essential to qualify this temperature for each bitumen grade. BIS de ned the ash point as the temperature at which the vapour of bitumen momentarily catches re
84
Bitumen Sample
50 cc Flask
Figure 23:4: Viscosity Test
in the form of ash under specified test conditions. The re point is defined as the lowest temperature under specified test conditions at which the bituminous material gets ignited and burns.
Float test
Normally the consistency of bituminous material can be measured either by penetration test or viscosity test. But for certain range of consistencies, these tests are not applicable and Float test is used. The apparatus consists of an aluminum oat and a brass collar filled with bitumen to be tested. The specimen in the mould is cooled to a temperature of 5oC and screwed in to oat. The total test assembly is floated in the water bath at 50oC and the time required for water to pass its way through the specimen plug is noted in seconds and is expressed as the oat value.
Water content test
It is desirable that the bitumen contains minimum water content to prevent foaming of the bitumen when it is heated above the boiling point of water. The water in a bitumen is determined by mixing known weight of specimen in a pure petroleum distillate free from water, heating and distilling of the water. The weight of the water condensed and collected is expressed as percentage by weight of the original sample. The allowable maximum water content should not be more than 0.2% by weight.
Loss on heating test
When the bitumen is heated it loses the volatility and gets hardened. About 50gm of the sample is weighed and heated to a temperature of 1630C for 5hours in a specified oven designed for this test. The sample specimen is weighed again after the heating period and loss in weight is expressed as percentage by weight of the original sample. Bitumen used in pavement mixes should not indicate more than 1% loss in weight, but for bitumen having penetration values 150-200 up to 2% loss in weight is allowed.
85